NR NR/L1/CIV/601 ISSUE 1 PDF

NR NR/L1/CIV/601 ISSUE 1 PDF

Name:
NR NR/L1/CIV/601 ISSUE 1 PDF

Published Date:
12/04/2021

Status:
[ Active ]

Description:

Managing the Highways Interface

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$13.2
Need Help?
PDF ONLY

This policy covers all projects and maintenance works that impact the publicly maintained highway/road network and can import risk to Network Rail. All works promoters will be supported by the Highways Interface teams in either the applicable Region or Routes. 

For processes, please refer to: 

NR/L2/CIV/602 Highways Interface Planning Process

NR/L3/CIV/603 Working at the Highways Interface 

Collectively this supports Network Rail’s obligations under its Network License between the Office of Rail and Road and Network Rail Infrastructure Limited.

Purpose 

This policy provides a National framework for the Network Rail Highways Interface function. It supports Network Rail to assess the effect of works on railway assets that impact the highway/road network and its users. The benefits reduce the risk ofimposed external timings of works by highway/road authorities under section 56 (section 115) of the New Roads and Street Works Act 1991. Allowing internally planned and/or delivered projects, (such as major bridge works or level crossing maintenance), to be co-ordinated in a timely, collaborative, and consistent manner.

It reduces the risk of inconsistent high-level processes and behaviours leading to negative reputational impact for Network Rail so that works are carried out to the appropriate level of quality as agreed by Network Rail and the Highway/Road Authorities.

It protects persons associated with the delivery of the project from dangers to their health and safety, and others who might be affected by the work activity, including members of the public.

NOTE: for example, passengers, pedestrians, cyclists, equestrians, and motorists. See STE/HSMS/001 CLAUSE 4.11.2

These include arrangements for design (including planning and risk assessment) and management (including supervision) of the worksite. (including signing, lighting, and guarding). As required under sections 65 and 124 of the New Roads and Street Works Act 1991.


Edition : 1
File Size : 1 file , 480 KB
Number of Pages : 17
Published : 12/04/2021

History


Related products

NR NR/L3/SIG/10064/GI/U019 ISSUE 1
Published Date: 09/04/2021
General Instructions to Staff Working on S&T Equipment: Use of the Volt Stick
$5.7
NR TI 056 ISSUE 1
Published Date: 02/01/2007
Westinghouse Style 63 Point Machines
$7.5
NR BRS-SM 2335/6&12 ISSUE D
Published Date: 03/18/1996
Mechanical Supplementary Drive Mounted In 6' On Timber For U.I.C.54B GVS Layout Clamp Lock or Point M/C Operated
$5.7
NR BRS-SM 846/3
Published Date: 10/01/1989
Track Circuit Cables Termination of 50/0.25 Track Circuit Cable for Non-Rail End
$5.7

Best-Selling Products

CEMA 102-1994
Published Date: 01/01/1994
Conveyor Terms & Definitions
CEMA 110-1995
Published Date: 01/01/1995
Electrical Terms & Definitions
CEMA 201-1995
Published Date: 01/01/1995
Safety Label Brochure
CEMA 300-1999
Published Date: 01/01/1999
Screw Conveyors, Dimensional Standards
CEMA 300-2003
Published Date:
Screw Conveyors, Dimensional Standards