NR NR/L1/SIG/50021/01 ISSUE 1 PDF

NR NR/L1/SIG/50021/01 ISSUE 1 PDF

Name:
NR NR/L1/SIG/50021/01 ISSUE 1 PDF

Published Date:
06/04/2016

Status:
[ Active ]

Description:

Signalling Asset Policy: Workbank Planning

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$18.6
Need Help?
PDF ONLY

This module provides requirements for workbank planning which cover:

a) major interventions;

b) minor works; and

c) centrally managed costs.

It supports network assurance activities to inform Route submissions through use of infrastructure cost modelling. Digital Railway configuration states are provided to demonstrate the relationship between all types of signalling infrastructure and Digital Railway technologies.

This module applies to Route Asset Management (RAM) Signalling teams responsible for workbank planning.

Purpose

The purpose of this module is to specify the requirements to undertake workbank planning for Control, Command and Signalling (CCS) systems for CP6 and beyond.

NOTE: It should be read in conjunction with other asset policies.

 


Edition : 1
File Size : 1 file , 600 KB
Number of Pages : 47
Published : 06/04/2016

History


Related products

NR NR/L3/OCS/044/MS-08 ISSUE 6
Published Date: 06/02/2012
Managed Station Manual: Safe Use and Operation of Station Vehicles
$7.5
NR E10000/94/12 ISSUE A
Published Date: 10/01/1984
Power Supply - Somerton Reb Power Supply (B/N50)
$5.7
NR BRS-ST 110/6
Published Date:
Plate Mounting, AWS Bell, Flashing Light Open Crossing
$5.7
NR NR/CIV/SD/829 ISSUE B
Published Date: 09/02/2017
Metallic Structure Repairs: Stiffener Repairs and Strengthening
$5.7

Best-Selling Products