NR NR/L1/SIG/50021/05 ISSUE 1 PDF

NR NR/L1/SIG/50021/05 ISSUE 1 PDF

Name:
NR NR/L1/SIG/50021/05 ISSUE 1 PDF

Published Date:
03/04/2023

Status:
[ Active ]

Description:

Signalling Asset Policy: System Definition

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$18.6
Need Help?
PDF ONLY

This module applies to any signalling intervention planned through the signalling workbank (minor works are excluded). 

Purpose 

This module specifies how to measure signalling volume and the system features to be delivered by major signalling interventions. This supports effective planning and assurance at local and network level, and regulatory reporting of planned and delivered effective volumes to stake holders.

This reduces the risk of insufficient finance or resources being available to deliver signalling renewals and supports efficiency reporting to reduce financial risk.


Edition : 1
File Size : 1 file , 510 KB
Number of Pages : 25
Published : 03/04/2023

History


Related products

NR NR/L2/MTC/10662/05 ISSUE 2
Published Date: 03/04/2023
Process for the Creation of New or Revised Maintenance Regimes Using Reliability Centred Maintenance (RCM): Track end to end process
$18.6
NR NR/L2/TRK/4239 ISSUE 3
Published Date: 12/02/2023
Track Bed Investigation, Design and Installation
$24.3
NR NR/L2/SIG/11201/MOD A4-7 ISSUE 1
Published Date: 06/02/2018
Signalling Design Handbook: Mechanical Locking & Mechanical Engineering Detail
$7.5
NR NR/CIV/SD/2121-2 ISSUE B
Published Date: 04/27/2012
Conarch Overbridge: Reinforcement Details 8.4m Internal Unit - Square Span
$5.7

Best-Selling Products