NR NR/L1/SIG/50021 ISSUE 4 PDF

NR NR/L1/SIG/50021 ISSUE 4 PDF

Name:
NR NR/L1/SIG/50021 ISSUE 4 PDF

Published Date:
03/04/2023

Status:
[ Revised ]

Description:

Signalling Asset Policy

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$18.6
Need Help?
INACTIVE FOR NEW DESIGN * PDF ONLY

The policy applies to all employees and others engaged in activities connected with any aspect of a Signalling asset life cycle.

Purpose

The purpose of this document is to specify the asset management policy for Control, Command and Signalling (CCS) systems for CP6 and beyond.

NOTE: It should be read in conjunction with other asset policies.

The CCS asset management policy seeks to optimise the performance, risk and cost of ownership of the Signalling estate across all of its life cycle stages from concept to disposal to deliver minimum whole life cost. 

The policy is structured around the six main subject areas and 39 sub-groups identified in the Institute of Asset Management document ‘Anatomy of Asset Management’

• strategy and planning

• asset management decision-making

• life cycle delivery

• asset information

• organisation and people; and

• risk and review.

The Institute of Asset Management guidance is recognised as best practice against which Network Rail is measured by the Office of Rail and Road, ‘The Regulator’.


Edition : 4
File Size : 1 file , 780 KB
Number of Pages : 24
Published : 03/04/2023

History

NR NR/L1/SIG/50021 ISSUE 4
Published Date: 03/04/2023
Signalling Asset Policy
$18.6
NR NR/L1/SIG/50021 ISSUE 3
Published Date: 12/03/2016
Signalling Asset Policy
$18.6

Related products

NR NR/L3/TRK/002/A01 ISSUE 5
Published Date: 09/01/2010
Track Patrol (Foot & Mechanised)
$5.7
NR NR/CIV/SD/2516 ISSUE B
Published Date: 09/02/2017
Modular Overbridge Design: Reinforced Earth Abutment and Cill Details
$5.7
NR BRS-SM 3202 ISSUE A
Published Date: 06/10/2015
RCPL Operated Point Layout with Tubular Stretcher Bars - Full Depth BV Switches CEN56/CEN56 (113A FB) - Mechanical Supplementary Drive Mounted in 4 Foot
$5.7
NR RT/ETE/2/2/1
Published Date: 03/17/1998
Location & Spacing of Anchor Insulators for Steel Conductor Rail (Welded or Fishplated) and Asc Conductor Rail
$5.7

Best-Selling Products

Gypsum Construction Handbook
Published Date: 05/01/1992
$9.9