Name:
NR NR/L1/TEL/30092 ISSUE 4 PDF
Published Date:
12/03/2016
Status:
[ Withdrawn ]
Publisher:
Network Rail
This procedure applies to Network Rail and its contractors involved in the telecoms testing and commissioning process.
This procedure applies to:
a) new / renewed equipment/systems; and
b) modified or upgraded equipment/systems.
This procedure does not apply to testing undertaken as part of day-to-day maintenance / fault rectification activities.
This procedure does not detail any occupational health and safety requirements or Construction (Design and Management) Regulation requirements.
Purpose
The purpose of this document is to detail the procedure for testing and commissioning of telecoms equipment and systems installed on Network Rail controlled infrastructure.
The testing and commissioning activity is essential for validating and verifying the design meets the requirements.
| Edition : | 4 |
| File Size : | 1 file , 680 KB |
| Number of Pages : | 19 |
| Published : | 12/03/2016 |