Description:

Level Crossing Asset Policy: Level Crossing Asset Data and Information

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$13.2
Need Help?
PDF ONLY

2.1 General

The scope of this module includes:

a) any data or information used for the management of level crossings through the lifecycle of the level crossing asset system including, creation, renewal,

operation and maintenance, decommissioning and disposal ;

b) any data or information used to inform level crossing investment decisions or work bank planning;

c) any data or information collected through census or monitoring of level crossing usage; and

d) any data or information used for the purpose of internal or external corporate reporting in the area of level crossings.

NOTE: Auxiliary or complimentary systems associated with level crossings that have no direct interface to the signaller, user or signalling system in the management and control of level crossings

are also considered within scope of the module e.g. Red Light Safety Cameras, event recording systems, surveillance camera systems and census recording systems.

This module focuses on five key areas:

a) data capture and collection including definition and quality standards;

b) data and information ownership, maintenance, management and governance;

c) the migration of locally held and /or unstructured data and information to corporate data formats and systems.

d) data and information processes and system tools; and

e) data and information security.

2.2 Roles and Responsibilities

This module applies to:

a) Route Level Crossing Managers;

b) Route Asset Managers [Track and Lineside], [Signalling] and [Electrical Power];

c) equivalent posts in Network Rail Telecom;

d) operational posts responsible for the management of risk of the level crossing estate;

e) all Network Rail staff responsible for the management of level crossing asset data and Route defined roles responsible for the management of asset data.

ISO 8000 specifies 3 generic data roles across three processes.

Purpose

This module sets out Network Rail’s strategy to:

a) manage level crossing data and information; and

b) its specification, collection and use.

It supports the level crossing asset policy by:

a) supporting the reduction in level crossing safety risk through better decision making;

b) reducing the overall operational cost of level crossings through increased use of asset data information;

c) reducing the overall total whole life cost of level crossings including initial capital cost of installation, on-going maintenance and lifetime support; and

d) moving reliance for the management of level crossings from people to technology.

NOTE: This includes the migration of locally held unstructured data and information into corporate systems.

The module:

a) provides clarity about Network Rail‘s strategy and intentions in the area of level crossing data and information management;

b) gives broad guidance to suppliers and potential suppliers of level crossing technology, informing their asset management plan and investments in

product development;

c) through the asset information specification, allow a better understanding of asset data supply requirements;

d) sets out ownership, accountabilities and governance for level crossing asset data and information reporting in a devolved business model between

operationally accountable roles and a central strategic design authority with key stakeholders;

e) develops a consistent asset condition data set for passive crossings to inform interventions and investment decisions;

f) brings together and makes more readily available cross functional asset condition data to inform interventions and investment decisions for the active

level crossing system;

g) brings together and makes more readily available a wide range of data covering performance, safety risk, reliability, usage and configuration currently

held in different data bases and spreadsheets, structured and unstructured and in different formats;

h) develops and implements a level crossing asset data and information strategy consistent with the requirements of the Network Rail asset data policy


Edition : 2
File Size : 1 file , 420 KB
Number of Pages : 14
Published : 03/07/2020

History


Related products

NR E10018/15 ISSUE 2
Published Date: 09/01/2004
Typical Circuits Former Western Region Point Circuits Points LR
$5.7
NR BRS-ST 82/11
Published Date:
Pin Driving Lugs Lifting Barrier (Auto) MK II B
$5.7
NR RT/E/WI/27079 ISSUE 1
Published Date: 12/04/2004
Instruction for Maintenance of Motor Wound Spring Mechanism on OHL Switches Manufactured by Morris Line Equipment
$13.2
NR NR/L1/RSK/001 ISSUE 3
Published Date: 09/07/2019
Network Rail Risk Policy
$13.2

Best-Selling Products

SNV RFC 7723
Published Date: 01/01/2016
Port Control Protocol (PCP) Anycast Addresses
$9.6
SNV SIA 196*SN 531196
Published Date: 11/01/1998
Baulueftung im Untertagbau
$44.7
SNV SIA 196
Published Date: 11/01/1998
Ventilation des chantiers souterrains
$44.7
SNV SIA 197/1*SN 505197/1
Published Date: 10/01/2004
Projektierung Tunnel Bahntunnel
$38.4
SNV SIA 197/2*SN 505197/2
Published Date: 10/01/2004
Projektierung Tunnel Strassentunnel
$38.4
SNV SIA 197*SN 505197
Published Date: 10/01/2004
Projektierung Tunnel Grundlagen
$41.1