NR NR/L2/CIV/005/04 ISSUE 1 PDF

NR NR/L2/CIV/005/04 ISSUE 1 PDF

Name:
NR NR/L2/CIV/005/04 ISSUE 1 PDF

Published Date:
06/02/2018

Status:
[ Active ]

Description:

Drainage Systems Manual: Drainage Inspections

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$18.6
Need Help?
PDF ONLY

This module applies to all the functions that contribute to the inspection phase of the drainage life cycle. This includes both the Route Asset Manager (RAM) and Maintenance functions.

This module defines the requirements for the following Ellipse Standard Jobs:

a) Drainage System Defect Inspection (standard job 009045)

b) Drainage System Condition Inspection (standard job 009616)

This document does not cover:

a) Drainage Assessment (standard job 009620), the requirements of which are specified in NR/L2/CIV/005/08, Drainage Assessment.

b) Drainage Surveys (standard job 009621 and 009692), the requirements of which are specified in NR/L2/CIV/005/05, Drainage Surveys.

c) Examination of the structural integrity of culverts (greater than 450mm in internal diameter), the requirements of which are specified in NR/L3/CIV/006/1C, Handbook of the Examination of Structures, Part 3A: Culverts.

Purpose

This module helps mitigate the risk of drainage system failure by specifying the requirements for inspecting railway drainage systems. The module forms part of the Drainage NR/L2/CIV/005 manual as shown in the process map in NR/L2/CIV/005, Drainage System Manual.


Edition : 1
File Size : 1 file , 3.5 MB
Number of Pages : 27
Published : 06/02/2018

History


Related products

NR NR/L3/SIG/10665 ISSUE 23
Published Date: 06/03/2023
Reliability Centred Maintenance of Signalling Equipment
$24.3
NR NR/L3/INV/3001/RIM102 ISSUE 1
Published Date: 12/03/2011
Reporting & Investigation Manual: Reporting of Accidents, Incidents & Occupational Ill Health to SMIS
$13.2
NR E10000/11/1 ISSUE D
Published Date: 08/01/1991
Track Circuits - Steady DC (Non-Immune)
$5.7
NR NR/L3/ELP/SAI25/11 ISSUE 2
Published Date: 12/02/2023
Working On or About Overhead Line Equipment (SAI): Working On Overhead Line Equipment
$13.2

Best-Selling Products

TPI 1
Published Date: 01/01/2022
National Design Standard for Metal Plate Connected Wood Truss Construction
$39.6
TPI ANSI/TPI-1
Published Date: 01/01/2005
NATIONAL DESIGN STANDARD FOR METAL PLATE CONNECTED WOOD TRUSS CONSTRUCTION
TPI ANSI/TPI-1
Published Date: 03/18/2016
NATIONAL DESIGN STANDARD FOR METAL PLATE CONNECTED WOOD TRUSS CONSTRUCTION
$37.2
TPI ANSI/TPI-1
Published Date: 02/29/1996
NATIONAL DESIGN STANDARD FOR METAL PLATE CONNECTED WOOD TRUSS CONSTRUCTION
TPI ANSI/TPI-1
Published Date: 07/15/2011
NATIONAL DESIGN STANDARD FOR METAL PLATE CONNECTED WOOD TRUSS CONSTRUCTION
TPI ANSI/TPI-1
Published Date: 07/18/2003
NATIONAL DESIGN STANDARD FOR METAL PLATE CONNECTED WOOD TRUSS CONSTRUCTION