NR NR/L2/CIV/032/MOD02A ISSUE 1 PDF

NR NR/L2/CIV/032/MOD02A ISSUE 1 PDF

Name:
NR NR/L2/CIV/032/MOD02A ISSUE 1 PDF

Published Date:
12/04/2021

Status:
[ Active ]

Description:

The Management of Structures Manual: Retaining Walls Risk-Based Prioritisation Procedures

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$13.2
Need Help?
PDF ONLY

With the exception of the following wall types, this document applies to all Retaining Walls throughout their entire lifecycle, including non-operational assets. 

• Minor Retaining Walls;

• River training walls managed as Coastal, Estuarine and River Defences;

• Catch walls and netting;

• Boundary walls, including acoustic barriers;

• Free standing walls;

• Walls providing edge protection against falls from height;

• Wing walls, spandrels, headwalls and abutments that are managed as part of a bridge, culvert or tunnel;

• Ballast boards that are managed as part of the track formation;

• Platform riser walls;

• Reinforced soil slopes, with or without soil nails or other mechanical anchors whose face angle is less than 70 degrees to the horizontal and are managed as earthworks.

NOTE: This process is currently limited to train derailment risk only; other risks continue to be managed using separate processes.

Purpose 

This module sets out the risk-based procedures for prioritising Retaining Walls, and the associated management activities carried out on those walls.

The overarching purpose is to manage the train derailment safety risk of Retaining Wall Functional Failure that could result in a safety related incident.


Edition : 1
File Size : 1 file , 580 KB
Number of Pages : 19
Published : 12/04/2021

History


Related products

NR NR/CIV/SD/1381 ISSUE G
Published Date: 09/02/2017
U-Type Underbridges: Filler Rail
$5.7
NR BRS-SM 370/6
Published Date: 04/01/1970
FPL Bar Fittings (BH Rail) Washer
$5.7
NR E10000/96/18 ISSUE A
Published Date: 10/01/1980
Over-Rides - Through Routes Geographical JC. Multi-Route Selective with Auto Facility on Selected Routes (3)
$5.7
NR NR/CIV/SD/1527 ISSUE C
Published Date: 12/03/2016
E-Type Underbridges: Main Girder: Composite Floor
$5.7

Best-Selling Products

NS-EN ISO/IEEE 11073-10201:2020
Published Date: 07/02/2020
Health informatics — Device interoperability — Part 10201: Point-of-care medical device communication — Domain information model (ISO/IEEE 11073-10201:2020)
NS-EN ISO/IEEE 11073-10404:2022
Published Date: 01/05/2023
Health informatics — Device interoperability — Part 10404: Personal health device communication — Device specialization — Pulse oximeter (ISO/IEEE 11073-10404:2022)
NS-EN ISO/IEEE 11073-10408:2022
Published Date: 01/05/2023
Health informatics — Device interoperability — Part 10408: Personal health device communication — Device specialization — Thermometer (ISO/IEEE 11073-10408:2022)
NS-EN ISO/IEEE 11073-10415:2022
Published Date: 01/05/2023
Health informatics — Device interoperability — Part 10415: Personal health device communication — Device specialization — Weighing scale (ISO/IEEE 11073-10415:2022)
NS-EN ISO/IEEE 11073-10419:2023
Published Date: 09/11/2023
Health informatics - Personal health device communication - Part 10419: Device specialization - Insulin pump (ISO/IEEE 11073-10419:2019)
NS-EN ISO/IEEE 11073-40101:2022
Published Date: 05/05/2022
Health informatics - Device interoperability - Part 40101: Foundational - Cybersecurity - Processes for vulnerability assessment (ISO/IEEE 11073-40101:2022)