NR NR/L2/CIV/086/MOD09 ISSUE 1 PDF

NR NR/L2/CIV/086/MOD09 ISSUE 1 PDF

Name:
NR NR/L2/CIV/086/MOD09 ISSUE 1 PDF

Published Date:
09/02/2017

Status:
[ Revised ]

Description:

Management of Earthworks Manual: Earthworks Adverse/Extreme Weather Risk Assessment

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$13.2
Need Help?
PDF ONLY

This document covers the procedures for:

a) selecting earthworks (or sections of lines) for inclusion in an A/EWP

b) identifying the actions to be taken during A/EW events to maintain levels of safety and performance

c) developing, reviewing and updating an A/EWP.

These procedures apply to all earthworks within the Network Rail boundary, and slopes outside of the boundary which may affect the Network Rail infrastructure.

The threat of A/EW to earthworks relates only to intense or prolonged rainfall or flooding. It does not include strong winds, drought or extreme temperatures.

Purpose

Earthworks identified from risk assessment as Risk level 4 (as described in Appendix A.5) of failure from Adverse/Extreme Weather (A/EW) will be reviewed for inclusion in an Adverse/Extreme Weather Plan (A/EWP).

This plan contains the actions required to mitigate the risk to the safe operation or performance of the railway infrastructure during A/EW.

This procedure manages the control, ‘weather – managing operational risk’ mitigating the following risks:

• Loss of track support and/or geometry and slope failure;

• Slope failure leading to loss of kinematic envelope and/or track geometry.


Edition : 1
File Size : 3 files , 2.3 MB
Number of Pages : 16
Published : 09/02/2017

History

NR NR/L2/CIV/086/MOD09 ISSUE 2
Published Date: 06/01/2024
Management of Earthworks Manual: Earthworks Adverse/Extreme Weather Risk Assessment
$13.2
NR NR/L2/CIV/086/MOD09 ISSUE 1
Published Date: 09/02/2017
Management of Earthworks Manual: Earthworks Adverse/Extreme Weather Risk Assessment
$13.2

Related products

NR BRS-SM 2042 ISSUE A
Published Date: 02/11/1992
Colour Light Signals Support for Lower Footstep
$5.7
NR BRS-SM 2092 ISSUE A
Published Date: 02/11/1992
Colour Light Signals Retaining Bracket for Lower Footstep on 612, 912 & 1262 Wide Stages
$5.7
NR NR/L3/NDS/308/LMB2.8 ISSUE 1
Published Date: 03/01/2012
Slinger Train 4 Sleepers and Long Rails
$5.7
NR TWI 2T024 ISSUE 1
Published Date: 03/01/2005
How to Measure and Define Twist
$5.7

Best-Selling Products

AHRI 1010-94
Published Date: 01/01/1994
Self-Contained, Mechanically Refrigerated Drinking-Water Coolers
$7.5
AHRI 1060-00
Published Date: 01/01/2000
Rating Air-to-Air Energy Recovery Ventilation Equipment
$13.5
AHRI 1060-01
Published Date: 09/01/2001
Rating Air-to-Air Heat Exchangers for Energy Recovery Ventilation Equipment
$8.7
AHRI 1060-2005
Published Date: 2005
Performance Rating of Air-To-Air Heat Exchangers for Energy Recovery Ventilation Heat Equipment
$6.9
AHRI 1060-2011
Published Date: 2011
Performance Rating of Air-To-Air Heat Exchangers for Energy Recovery Ventilation Heat Equipment (I-P) (AHRI)
$6.9
AHRI 1060-2013
Published Date: 2013
Performance Rating of Air-To-Air Heat Exchangers for Energy Recovery Ventilation Heat Equipment (I-P) (AHRI)
$6.9