NR NR/L2/CIV/172 ISSUE 2 PDF

NR NR/L2/CIV/172 ISSUE 2 PDF

Name:
NR NR/L2/CIV/172 ISSUE 2 PDF

Published Date:
09/03/2022

Status:
[ Active ]

Description:

Buildings and Architecture: Instructing Reactive, Minor Emerging Works and Business Plan Interventions

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$13.2
Need Help?
PDF ONLY

This document applies to staff responsible for the management of Buildings & Architecture assets and to contractors that carry out maintenance and repair work on behalf of Network Rail.

This process covers reactive works, Minor Emerging Works (MEW) and business plan works of fabric, structural and Mechanical and Electrical (M&E) Assets within the Buildings and Architecture portfolio. 

The Buildings and Architecture portfolio includes the following properties:

a) Stations – managed

b) Stations – franchised

c) Light Maintenance Depots 

d) Route Services Depots

e) Maintenance Delivery Units

f) Lineside buildings (critical, non-critical and redundant)

g) Closed stations and platforms. 

Purpose 

This document outlines the business process for instructing Reactive works, Minor Emerging Works and Business Planning works for Buildings & Architecture Assets. 

Asset maintenance is managed through planned and reactive measures (interventions). Planned Preventative Maintenance (PPM) is not covered by this Standard. 

Benefits include: 

a) responding to risk events before they occur through the application of achievable mitigation to all risk areas 

b) extending the life of new and existing assets using an economic maintenance intervention cycle for each asset element

c) maintaining a safe environment for public and staff 

d) protecting critical assets within the building envelope 

e) providing access and minimising disruption to the public. 

This business process helps mitigate the following risks: 

a) Train collision due to failure of building asset 

b) Loss of safe environment 

c) Surface slips, trips and falls.


Edition : 2
File Size : 1 file , 380 KB
Number of Pages : 14
Published : 09/03/2022

History

NR NR/L2/CIV/172 ISSUE 2
Published Date: 09/03/2022
Buildings and Architecture: Instructing Reactive, Minor Emerging Works and Business Plan Interventions
$13.2
NR NR/L2/CIV/172 ISSUE 1
Published Date: 12/02/2017
Buildings and Architecture: Instructing Reactive, Minor Emerging Works and Business Plan Interventions
$13.2

Related products

NR BRS-SE 170/3
Published Date:
Position Light Signals Lens Conversion Kit Light Screen WB&SCO Westlyte Signals E4820& E4820-1
$5.7
NR T28323 ISSUE 2
Published Date: 01/08/1998
Lineside & On Track Equipment Typical Circuits Signals & Indicators Colour Light; Lighting Circuit; 4 Aspect; R/Y/YY/G + Position Light; SSI; with External Proving Relays
$5.7
NR NR/L3/SIG/11235/G130/EL1053 ISSUE 1
Published Date: 09/04/2021
Signal Maintenance Testing Handbook: PIN Code 202 (Style QS1) Relay and Plugboard Conversion to PIN Code 201 (Style QS2) Relay and Plugboard
$5.7
NR NR/L2/SIG/11201/MOD B1 ISSUE 6
Published Date: 06/05/2021
Signalling Design Handbook: General Introduction
$7.5

Best-Selling Products

ALL HEI STANDARDS
Published Date: 2018
$900
HEI Standards Discount Bundle 1
Published Date: 2018
$450
HEI Standards Discount Bundle 2
Published Date: 2018
$510
HEI Tech Sheet #103
Published Date: 09/25/2014
Ejector Discharge Pressure
Free Download