NR NR/L2/ELP/21088/MOD 04 ISSUE 1 PDF

NR NR/L2/ELP/21088/MOD 04 ISSUE 1 PDF

Name:
NR NR/L2/ELP/21088/MOD 04 ISSUE 1 PDF

Published Date:
12/05/2015

Status:
[ Active ]

Description:

General Maintenance Parameters for Overhead Line Electrification Equipment: Mark 3 Maintenance Parameters

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$7.5
Need Help?
PDF ONLY

This module of NR/L2/ELP/21088 covers:

a) Equipment Design;

b) Equipment Design Variations;

c) Equipment Design Designations;

d) Environmental Conditions;

e) Maximum Pantograph Operational Speeds;

f) Continuous Current Carrying Capacity;

g) Design Staggers and Deviation;

h) Minimum Staggers;

i) Design Heights;

j) Heel Settings;

k) Track Tolerances;

l) Maximum Dropper Spacing;

m) Conductor Particulars;

n) Conductor Tensions;

o) Factor of Safety.


Edition : 1
File Size : 1 file , 81 KB
Number of Pages : 10
Published : 12/05/2015

History


Related products

NR NR/L3/SIG/10064/GI/X021 ISSUE 3
Published Date: 09/04/2021
General Instructions to Staff Working on S&T Equipment: Safety in Battery Rooms
$5.7
NR NR/CIV/SD/FORM1/4300 ISSUE 2
Published Date: 03/07/2020
Station Footbridges: Ribbon Open Footbridge Series 4300: Form 001
$52.2
NR NR/CIV/SD/FORMA/260 ISSUE P1
Published Date: 03/03/2012
Form A: Cess Support Structures
$18.6
NR NR/BS/LI/056 ISSUE 1
Published Date: 09/11/2006
Letter of Instruction: Permali Bushings: Access Restrictions
$5.7

Best-Selling Products

Electrical Review for Electricians
Published Date: 01/01/1996