NR NR/L2/ELP/21088/MOD 14 ISSUE 1 PDF

NR NR/L2/ELP/21088/MOD 14 ISSUE 1 PDF

Name:
NR NR/L2/ELP/21088/MOD 14 ISSUE 1 PDF

Published Date:
12/05/2015

Status:
[ Active ]

Description:

General Maintenance Parameters for Overhead Line Electrification Equipment: SICAT Maintenance Parameters

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$7.5
Need Help?
PDF ONLY

This module of NR/L2/ELP/21088 covers:

a) Equipment Design;

b) Equipment Design Variations;

c) Equipment Design Designations;

d) Environmental Conditions;

e) Maximum Pantograph Operational Speeds;

f) Continuous Current Carrying Capacity;

g) Design Staggers and Deviation;

h) Design Heights;

i) Heel Settings;

j) Track Tolerances;

k) Maximum Dropper Spacing;

l) Conductor Particulars;

m) Conductor Tensions;

n) Factor of Safety.


Edition : 1
File Size : 1 file , 65 KB
Number of Pages : 7
Published : 12/05/2015

History


Related products

NR NR/L3/INI/CI0029 ISSUE 2
Published Date: 06/01/2008
Project Procedure for Land Negotiations (Temporary & Permanent)
$13.2
NR SMF/MG/449 ISSUE 3
Published Date: 03/02/2013
E&P Maintenance Engineer Activity Self Assurance
$5.7
NR NR/L3/CIV/006/3G ISSUE 2
Published Date: 09/03/2022
Structures, Tunnels and Operational Property Examinations: Examination of Operational Property Structures, Fabric and M&E - Reporting and Recording of Examinations in Citadel
$24.3
NR RT/ETE/6/A/2
Published Date: 03/17/1998
Carriage Shed Overhead Contact Wire. E.O.E. - 1 - Type
$5.7

Best-Selling Products