NR NR/L2/ELP/21088/MOD 17 ISSUE 2 PDF

NR NR/L2/ELP/21088/MOD 17 ISSUE 2 PDF

Name:
NR NR/L2/ELP/21088/MOD 17 ISSUE 2 PDF

Published Date:
12/05/2015

Status:
[ Active ]

Description:

General Maintenance Parameters for Overhead Line Electrification Equipment: Series 2 Maintenance Parameters

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$13.2
Need Help?
PDF ONLY

This module of NR/L2/ELP/21088 covers:

a) Equipment Design;

b) Equipment Design Variations;

c) Equipment Design Designations;

d) Environmental Conditions;

e) Maximum Pantograph Operational Speeds;

f) Continuous Current Carrying Capacity;

g) Design Staggers and Deviation;

h) Minimum Staggers;

i) Design Heights;

j) Heel Settings;

k) Track Tolerances;

l) Maximum Dropper Spacing;

m) Conductor Particulars;

n) Conductor Tensions;

o) Factor of Safety.


Edition : 2
File Size : 1 file , 140 KB
Number of Pages : 11
Published : 12/05/2015

History


Related products

NR RT/E/C/19254 ISSUE 4
Published Date: 12/01/2002
Signalling Equipment Workshop Engineering Notice (SIGWEN003) GEC-GS HW Point Machine (aka NR/GN/SIG/19254)
$13.2
NR T04324 ISSUE 1
Published Date: 03/01/2014
LINESIDE AND ON-TRACK EQUIPMENT TYPICAL CIRCUITS - TRACK CIRCUITS EBI TRACK 200 TCU TX/RX-SINGLE RAIL ONLY
$5.7
NR OP/NDS/MS/004 ISSUE 1
Published Date: 06/01/2007
VG Clements Limited: Standard Activity Methodology for Long Welded Rail Train Delivery & Recovery
$13.2
NR NR/CIV/SD/450 ISSUE G
Published Date: 06/01/2019
Footbridges Non-Stations: Truss Staircase - Straight Flights
$5.7

Best-Selling Products

Handbook of Corrosion Inhibitors
Published Date: 01/01/2011
$105
Handbook of Fillers, Extenders, and Diluents
Published Date: 01/01/2008
$88.5
Handbook of Flavors and Fragrances
Published Date: 01/01/2008
$112.5
Handbook of Food Additives
Published Date: 01/01/2008
$112.5