NR NR/L2/ELP/27214 ISSUE 3 PDF

NR NR/L2/ELP/27214 ISSUE 3 PDF

Name:
NR NR/L2/ELP/27214 ISSUE 3 PDF

Published Date:
08/26/2008

Status:
[ Active ]

Description:

Maintenance of Mark 3B Overhead Line Equipment

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$18.6
Need Help?
PDF ONLY

Introduction

This Specification details the maintenance tolerances for Mark 3B design Overhead Line Equipment and shows the background information and method of formulation.


Edition : 3
File Size : 1 file , 880 KB
Number of Pages : 36
Published : 08/26/2008

History


Related products

NR NR/L3/ELP/29987/MOD05 ISSUE 7
Published Date: 09/03/2022
Working on or About 25 kV A.C. Electrified Lines: Particular Actions to Be Taken by the Infrastructure Maintainer
$7.5
NR NR/CIV/SD/1735 ISSUE B
Published Date: 09/04/2010
Concrete Underbridges: Cill Units General Arrangements: Pre-Cast Off Site Pre Stressed Solid Box Beam Deck
$5.7
NR NR/CIV/SD/1236 ISSUE C
Published Date: 12/03/2016
Z-Type Underbridges: Transverse Rib & Trimmer Girder: 0 to 25 Degrees Skew Steel Floor
$5.7
NR NR/SP/SIG/50012 ISSUE 2
Published Date: 04/01/2006
Methodology for the Demonstration of Compatibility with TPWS Track Sub-System
$18.6

Best-Selling Products

IPC 0040
Published Date: 05/01/2003
Optoelectronics Assembly and Packaging Technology
$51.9
IPC 1071
Published Date: 12/01/2010
Best Industry Practices for Intellectual Property Protection in Printed Board Manufacturing
$29.1
IPC 1071A
Published Date: 08/01/2014
Best Industry Practices for Intellectual Property Protection in Printed Board Manufacturing
$29.1
IPC 1131
Published Date: 04/01/2000
Information Technology Guide for PWB Manufacturers
$29.1