NR NR/L2/ELP/27314 ISSUE 1 PDF

NR NR/L2/ELP/27314 ISSUE 1 PDF

Name:
NR NR/L2/ELP/27314 ISSUE 1 PDF

Published Date:
12/02/2017

Status:
[ Revised ]

Description:

Testing and Commissioning of New or Modified Overhead Contact Systems

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$24.3
Need Help?
PDF ONLY

Applicability

This document applies to all activities associated with the Testing and Commissioning of OCS except for the requirements of product type testing. The testing requirements defined in this document apply to OCS infrastructure only. 

Exclusion

This document does not apply to electrification and plant asset routine maintenance or testing activities, design assurance of any site changes, work carried out under emergency conditions or project works that can be carried out solely within the parameters of the maintenance risk manual.

NOTE: Recovery from incidents involving damage to the OLE is covered in NR/L2/ELP/27032.

Purpose

The purpose of this document is to define the requirements to test and commission new or modified Overhead Contact System (OCS). This document sets out the procedures and process controls necessary to confirm that new OCS installations and alterations to existing installations, are tested in a manner that assures:

Compliance with legislation, standards, the project specifications and approved Design Details; and

Fitness for purpose before they are offered for Entry Into Operational Service.

This document outlines requirements for organisations and individuals who are required to test and commission new or modified OCS in accordance with the relevant sections of NR/L2/ELP/27311, ‘Engineering Assurance Requirements for Design and Implementation of Electrical Power Engineering Infrastructure’.

This document provides requirements to effectively manage the safety, reliability and other risks associated with poor installation while providing a framework for efficient application of Testing and Commissioning activities through the prevention of unnecessary rework.


Edition : 1
File Size : 1 file , 1.6 MB
Number of Pages : 91
Published : 12/02/2017

History

NR NR/L2/ELP/27314 ISSUE 2
Published Date: 09/07/2019
Construction Assurance for Overhead Contact Systems
$13.2
NR NR/L2/ELP/27314 ISSUE 1
Published Date: 12/02/2017
Testing and Commissioning of New or Modified Overhead Contact Systems
$24.3

Related products

NR RT/E/C/17904 ISSUE 1
Published Date: 08/01/2004
Risk Analysis of Signalling Relays (aka NR/GN/SIG/17904)
$13.2
NR T00014 ISSUE 14
Published Date: 12/01/2007
Lineside & On Track Equipment Typical Circuits Index (5)
$5.7
NR NR/L3/CIV/038 ISSUE 1
Published Date: 12/01/2008
Managing the Potential Effects of Coal Mining Subsidence
$13.2
NR BRS-SM 315/1 ISSUE A
Published Date: 10/24/1973
Base for Facing Point Lock MK II
$5.7

Best-Selling Products

SPI AQ-103
Published Date: 01/01/1994
Cosmetic Specifications of Injection Molded Parts
SPI AR-101
Published Date: 10/01/1996
Customs and Practices of the Moldmaking Industry
SPI AU 123
Published Date: 01/01/1992
Visual Evaluation of Reflected Color (Formerly PB-1)
SPI B151.1-1997
Published Date: 01/01/1997
Plastics Machinery - Horizontal Injection Molding Machines - Safety Requirements for Manufacture, Care, and Use
$11.1
SPI B151.15-2003
Published Date: 01/01/2003
Extrusion Blowmolding Machines - Safety Requirements for the Manufacture Care and Use
$13.8
SPI B151.2-1999
Published Date: 01/01/1999
Film Casting Machines - Construction, Care, and Use (revision and redesignation of ANSI B151.2-1982 (R1988))
$9.9