NR NR/L2/ELP/27401 ISSUE 1 PDF

NR NR/L2/ELP/27401 ISSUE 1 PDF

Name:
NR NR/L2/ELP/27401 ISSUE 1 PDF

Published Date:
12/05/2009

Status:
[ Revised ]

Description:

Configuration Management & Change to Protection & Control Systems

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$13.2
Need Help?
INACTIVE FOR NEW DESIGN * PDF ONLY

This standard applies to all protection and control devices for electrical installations, including traction electrification systems and fixed plant equipment.

Requirements for the development and application of settings, testing, monitoring the protection system and configuration control are stated in this standard.

All PaCD settings are subjected to the processes within this standard.

This standard does not apply to SCADA only devices.

Purpose

This standard states the requirement for management of hardware and software configuration of electrical fault protection and control devices.


Edition : 1
File Size : 1 file , 240 KB
Number of Pages : 16
Published : 12/05/2009

History

NR NR/L2/ELP/27401 ISSUE 2
Published Date: 12/03/2022
Configuration Management & Change to Protection & Control Systems
$13.2
NR NR/L2/ELP/27401 ISSUE 1
Published Date: 12/05/2009
Configuration Management & Change to Protection & Control Systems
$13.2

Related products

NR BRS-SM 53294 ISSUE A
Published Date: 12/03/2016
Machine Operated Point Layout with Tubular Stretcher Bars, NR56 EVS Switches Double Drive Set up Parts Schedule, Mechanical Supplementary Drive Mounted in 4-Foot
$5.7
NR TI 064 ISSUE 1
Published Date: 04/01/2007
SMTH: Replace a Westinghouse Style 63 Circuit Controller
$7.5
NR BRS-SM 2315/1
Published Date: 02/17/1994
Backdrive & Detection Swing Nose Crossing Mounting Plate
$5.7
NR BR 818
Published Date: 11/01/1974
Specification for Self Supporting Aerial Electric Cables for Railway Signalling (Metric Units)
$7.5

Best-Selling Products