NR NR/L2/ELP/27715 ISSUE 4 PDF

NR NR/L2/ELP/27715 ISSUE 4 PDF

Name:
NR NR/L2/ELP/27715 ISSUE 4 PDF

Published Date:
12/02/2023

Status:
[ Active ]

Description:

Overhead Contact System Design Specification

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$18.6
Need Help?
PDF ONLY

This standard covers the processes and governance for the design of OCS for Network Rail and the relationship to sub-systems.

This standard is applicable to all OCS Designers.

It covers the design of the OCS for new electrification projects, renewals, and enhancements for the following system types:

• 25kV AC

• 750V DC

• 1500V DC

This standard does not include requirements for the following:

• Structural loading of OCS structures;

• Foundation design for OCS structures;

• Traction power equipment mounted on OCS structures, e.g. Structure Mounted Outdoor Switchgear;

• Rail systems on shared highway corridors;

• Fencing and security requirements for electrified routes;

• OCS designed for line speeds above 140mph (225km/h);

• Dual electrified overhead interface between a.c. and d.c. systems;

• Maintenance of existing clearances.

Purpose

The purpose of this standard is to specify the Network Rail requirements to achieve safety, economy and performance when developing Overhead Contact System (OCS) design for an electrified railway.

This document suite:

• Identifies electrical safety principles to allow the Principal Designer (CDM) to work with other railway sub system designers to allow the railway system safety to be optimised;

• Documents system level hazards and operating conditions deemed reasonably foreseeable which should be addressed by the Designer in a Common Safety Method (CSM) Risk Assessment;

• Contains guidance (in the modules) on the application of design to the National Technical Rules (NTRs), TSIs, euronorms, and external standards for the Designer.

• This document suite provides a common strategy to demonstrate compliance with key legislative requirements and optimise the design of railway subsystems, but is not intended to reiterate legislation and governing standards.


Edition : 4
File Size : 1 file , 650 KB
Number of Pages : 25
Published : 12/02/2023

History

NR NR/L2/ELP/27715 ISSUE 4
Published Date: 12/02/2023
Overhead Contact System Design Specification
$18.6
NR NR/L2/ELP/27715 ISSUE 3
Published Date: 09/01/2018
Overhead Contact System Design Specification
$18.6

Related products

NR BRS-SM 612 ISSUE A
Published Date: 03/10/1978
Stop Board Electrically Illuminated
$5.7
NR BRS-SE 10
Published Date: 10/21/1958
Terminal Blocks-One Inch Pitch-2, 4 & 6 Way
$5.7
NR NR/L3/MTC/RCS0216/GH05 ISSUE 2
Published Date: 03/03/2012
Risk Control Manual: Asbestos
$5.7
NR NR/L3/ELP/27240/NR/DIST C10M(B) ISSUE 3
Published Date: 03/01/2017
Routine inspection and secondary injection testing of LFZP 141 Optimho relay using ORTS 100 test set (For WCML W.I. GIS locations refer to NR/DIST C10n)
$5.7

Best-Selling Products

EPI DCOS (C)
Published Date: 02/01/2016
(CHINESE - TRADITIONAL) Data Centre Operations Standard
$41.1
EPI DCOS (S)
Published Date: 05/01/2016
(SPANISH) Estándar de Operaciones de Centros de Datos
$41.1
EPI DCOS
Published Date: 10/01/2021
Data Centre Operations Standard
$4.2
EPI DCOS
Published Date: 02/01/2016
(ENGLISH) Data Centre Operations Standard
$41.1