NR NR/L2/ELP/CTM015/011 ISSUE 2 PDF

NR NR/L2/ELP/CTM015/011 ISSUE 2 PDF

Name:
NR NR/L2/ELP/CTM015/011 ISSUE 2 PDF

Published Date:
06/01/2019

Status:
[ Active ]

Description:

Competence & Training in DC Conductor Rail Engineering - DCCR 11: Manage the Isolation and Earthing / Short Circuiting of Equipment

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$7.5
Need Help?
PDF ONLY

This competence standard applies in all circumstances where any person is required to manage the isolation and Earthing of DC Conductor Rail Equipment on Network Rail controlled infrastructure.

The level and extent of responsibility includes their own safety and that of others who might be affected by their work. The Person in Scope is expected to refer to others for authorisation when required, be responsible for the implementation of the instructions and work within set procedures and specifications. The Person in Scope is responsible for the quality of their completed work.

This competence standard is used to assess the competence of people undertaking electrical safety activities associated with the DC Conductor System Infrastructure.

Purpose

The purpose of this competence standard is to define competence for persons undertaking Level A (Nominated Person) DC Conductor Rail duties when working on or having access to live DC Conductor Rail Equipment. In addition persons holding this competence are required to be sufficiently competent in all Level B (Authorised Person) units.

 

 


Edition : 2
File Size : 1 file , 220 KB
Number of Pages : 8
Published : 06/01/2019

History


Related products

NR NR/L3/OCS/044/FS-02C ISSUE 1
Published Date: 06/04/2011
Managed Station Manual: Guidance for the Use & Processing of References
$5.7
NR BRS-SM 3279 ISSUE A
Published Date: 12/02/2013
RCPL Operated Point Layout with Tubular Stretcher Bars - NR56 FVS switches - Mechanical Supplementary Drive Mounted in 4 Foot
$5.7
NR NR/L3/SIG/10064/GI/G004 ISSUE 1
Published Date: 09/04/2021
General Instructions to Staff Working on S&T Equipment: Cable Terminated on Left Hand Side - Check Sheet
$5.7
NR NR/L3/MTC/RCS0216/GHE02 ISSUE 3
Published Date: 03/06/2021
Risk Control Manual: Waste Storage & Segregation
$5.7

Best-Selling Products

CI/Chlor 89
Published Date: 01/01/2006
Chlorine Scrubbing Systems, Third Edition
$27