NR NR/L2/ENV/115 ISSUE 1 PDF

NR NR/L2/ENV/115 ISSUE 1 PDF

Name:
NR NR/L2/ENV/115 ISSUE 1 PDF

Published Date:
03/03/2018

Status:
[ Active ]

Description:

Environment and Social Management System Requirements

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$18.6
Need Help?
PDF ONLY

This business process applies to all Network Rail business units and activities. All applicable business units are listed below:

Route Businesses

Infrastructure Projects

Route Services

Property

Safety, Technical and Engineering (STE)

Group Digital Railway

Corporate Communications

System Operator

Human Resources

Finance

The responsible job role for each standard requirement is given in the RACI in appendix A. Where the text references “Each business unit” the reader should refer to the RACI to determine whose responsibility it is to fulfil this requirement.

Purpose

This business process provides the framework requirements for Network Rail’s business units to implement and maintain an Environment and Social Management System (ESMS), which relates to the management of risks associated with Environment and Social activities.

It enables business units to implement a system aligned with ISO 14001:2015 that covers both Environment and Social requirements in support of Network Rail’s Environment and Social Performance Policy. The intended outcomes of the ESMS are to:

a) enhance environmental and social performance;

b) identify and fulfil all compliance obligations;

c) set and achieve environmental and social objectives.

Furthermore establishing a successful ESMS has other positive impacts on the business, including but not limited to:

a) cost savings;

b) enhanced business reputation;

c) enhanced employee engagement.


Edition : 1
File Size : 1 file , 600 KB
Number of Pages : 23
Published : 03/03/2018

History


Related products

NR NR/CIV/SD/4420 ISSUE 3
Published Date: 03/05/2021
Frame Covered Footbridge Series 4400: Plan - Platform Level
$5.7
NR NR/L3/SIG/MG0110 ISSUE 3
Published Date: 06/02/2012
Imposition and Removal of Emergency and Temporary Speed Restrictions
$13.2
NR NR/L3/INI/PG115/PS/016 ISSUE 2
Published Date: 12/04/2010
Planning and Programme Controls: Earned Value Reporting - Guidance on Definitions and Acceptable Practices
$13.2
NR NR/L2/CIV/003 ISSUE 8
Published Date: 12/02/2023
Engineering and Architectural Assurance of Building and Civil Engineering Works
$24.3

Best-Selling Products

PCSA 4
Published Date: 05/01/1988
Mobile Power Crane and Excavator and Hydraulic Crane Standard