NR NR/L2/INI/0300 ISSUE 1 PDF

NR NR/L2/INI/0300 ISSUE 1 PDF

Name:
NR NR/L2/INI/0300 ISSUE 1 PDF

Published Date:
03/02/2019

Status:
[ Withdrawn ]

Description:

Integrated Engineering Lifecycle for Projects (IELCP)

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$18.6
Need Help?
W/D * PDF ONLY

This Network Rail standard specifies the Integrated Engineering Lifecycle for Projects, its phases, engineering phase gate reviews, alignment and interaction with GRIP.

This Network Rail standard applies to all projects that require Investment Authority, as defined within IR01, Investment Regulations, and:

a) enhance or renew the operational railway; and / or

b) are carried out in a high street environment, e.g. car park developments.

NOTE: IR01, Investment Regulations, is available on Connect (IR01 is an internal document available to staff within Network Rail only).

This standard applies to all Network Rail Alliances and Joint Ventures that are within the scope as described above.

The relationship with the Investment Decision Framework (NR/L2/INI/P3M/102), the Programme Delivery Lifecycle, (NR/L2/INI/P3M/102) and Governance for Railway Investment Projects (NR/L2/INI/P3M/101) is shown in figure 1.

Purpose

The Integrated Engineering Lifecycle for Projects (IELCP) ties together project engineering activities, and acts as the integration, assurance and control layer between GRIP and the individual engineering discipline activities. It applies an integrated systems approach for project engineering activities and processes to:

a) help increase consistency across all engineering projects;

b) check the right engineering activities are completed at the right time; and

c) manage and reduce the risks associated with integrating engineering activities.


Edition : 1
File Size : 1 file , 1.1 MB
Number of Pages : 24
Published : 03/02/2019

History


Related products

NR NR/L3/MTC/RCS0216/TK46 ISSUE 2
Published Date: 03/03/2012
Risk Control Manual: Track Geometry Marking - Paint
$5.7
NR NR/CIV/SD/264 ISSUE D
Published Date: 09/02/2017
Ballast/Cess Support Structures: Anchored Driven Tubular Pile, Armco Type
$5.7
NR TWI 2S026 ISSUE 1
Published Date: 03/01/2005
How to Maintain Catchpoints and Spring Points
$5.7
NR NR/CIV/SD/114 ISSUE B
Published Date: 09/02/2017
Brick & Masonry Repairs: Temporary Works Arrangements Using Shoring for Live Load Conditions
$5.7

Best-Selling Products