NR NR/L2/INI/CP0075 ISSUE 2 PDF

NR NR/L2/INI/CP0075 ISSUE 2 PDF

Name:
NR NR/L2/INI/CP0075 ISSUE 2 PDF

Published Date:
12/07/2019

Status:
[ Active ]

Description:

Entry into Operational Service

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$13.2
Need Help?
PDF ONLY

This procedure covers the EIS of all new or altered Railway Infrastructure where a Designated Project Engineer (DPE) is appointed in accordance with NR/L2/INI/02009, Engineering Management for Projects.

The decision to bring a new or altered asset into service is the Project Manager’s and this decision considers requirements such as engineering, commercial, safety assurance, operational readiness, maintainer preparedness, Safety Verification and/or Interoperability.

This procedure does not apply where the entire EIS process for a project is covered in one single discipline standard.

Where Network Rail is not the Infrastructure Manager, the EIS procedure to be used is to be agreed with the relevant Infrastructure Manager.

Purpose

This procedure demonstrates how Network Rail as Infrastructure Manager, undertakes Entry Into Operational Service (EIS) of new or altered Railway Infrastructure. This is achieved by the demonstration that the assets provided, whether new, temporary or legacy assets, are suitable, sufficient and correctly configured to provide for the safe functional operational requirements of the Railway Infrastructure.

This procedure provides the requirements for a project to plan in advance of EIS activities starting, how new or altered Railway Infrastructure shall be Entered into Operational Service. The requirements for EIS are also described, including the relationship with discipline specific EIS standards and the roles and responsibilities of people involved with the process.


Edition : 2
File Size : 1 file , 500 KB
Number of Pages : 19
Published : 12/07/2019

History


Related products

NR RT/E/P/27160 ISSUE 1
Published Date: 12/01/2004
Installation of Bolts in Masonry, Brickwork or Concrete Using Polyester Resin Cartridges
$13.2
NR BRS-ST 110 ISSUE F
Published Date: 08/11/1977
Signal, Road Warning Flashing Light, Pole Mounted with St Andrew's Cross (for Open Crossing)
$5.7
NR RT/E/P/11305 ISSUE 1
Published Date: 02/01/2003
Provision of Data Loggers Used to Monitor Signalling Systems (aka NR/SP/SIG/11305)
$13.2
NR NR/L3/OPS/021 ISSUE 7
Published Date: 03/04/2023
Weather Management Index
$13.2

Best-Selling Products

TAPPI 0109DIRT
Published Date:
Dirt Estimation Chart (Opaque)
$34.5
TAPPI 0109DIRTCAL
Published Date:
Calibrated Size Estimation Chart
TAPPI 0109DIRTT
Published Date:
Size Estimation Chart (Transparency)
$25.2
TAPPI T 1006 sp-06
Published Date: 01/17/2006
Testing of Fiber Glass Mats: Use of Modified TAPPI Prodecures for Sampling and Lot Acceptance, Stiffness, Tear Resistance, Air Permeability, and Thickness
TAPPI T 1006 sp-10
Published Date: 01/01/2010
Testing of Fiber Glass Mats: Use of Modified TAPPI Prodecures for Sampling and Lot Acceptance, Stiffness, Tear Resistance, Air Permeability, and Thickness
$14.7
TAPPI T 1006 sp-15 (R2022)
Published Date: 2014
Testing of Fiber Glass Mats: Use of Modified TAPPI Prodecures for Sampling and Lot Acceptance, Stiffness, Tear Resistance, Air Permeability, and Thickness
$14.7