NR NR/L2/MTC/02020 ISSUE 7 PDF

NR NR/L2/MTC/02020 ISSUE 7 PDF

Name:
NR NR/L2/MTC/02020 ISSUE 7 PDF

Published Date:
06/01/2008

Status:
[ Active ]

Description:

Ellipse for Network Rail Work Management

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$13.2
Need Help?
PDF ONLY

This document applies to:

• Maintenance

• Engineering

• Information Management

• Infrastructure Investment

and all their staff who have responsibilities for asset maintenance, renewals and enhancements, including the management and reimbursement of contractors that provide services such as maintaining asset databases and the production and procurement of new contracts, for those assets that are nominated to be held within Ellipse. It also covers the management and future development of the Ellipse system.

Purpose

This document mandates the use of Ellipse and its associated processes and procedures.

Ellipse is a system for managing and recording asset maintenance activities. It is an integrated asset management system and associated set of processes which facilitates key planning and work management activities performed on assets and includes a register of nominated maintenance assets and agreed data attributes.

The System Business Owner shall be the Programme Manager, NST Maintenance Systems & Data. The Custodian of Ellipse shall be the Asset Knowledge Business Support Manager. Information Management shall provide technical system and business support to the users of Ellipse. Responsibility for the timely collection, validation, maintenance, integrity and audit of the data rests with the Maintenance function.


Edition : 7
File Size : 1 file , 370 KB
Number of Pages : 12
Published : 06/01/2008

History


Related products

NR TI 141 ISSUE 1
Published Date: 05/01/2009
SSI Interlocking MPM Mod States
$5.7
NR NR/L3/MTC/ME0201/CAL271 ISSUE 1
Published Date: 06/07/2008
Calibration of Metertech Digital Capacitance Meter
$5.7
NR NR/L3/CIV/071 ISSUE 4
Published Date: 06/04/2011
Geotechnical Design - This standard should only be used for reference to ensure 'The Control of Risk' until the compliance date of its replacement standard is reached, upon which this standard will be withdrawn. The development of all new processes and procedures should be to the replacement standard
$18.6
NR NR/L3/ELP/27240/NR/DIST C10P ISSUE 1
Published Date: 03/02/2019
Maintenance of Micom P521 Protection Relay
$5.7

Best-Selling Products

FAO/WHO FAO8876
Published Date: 01/01/2003
Food Quality and Safety Systems: A Training Manual on Food Hygiene and the Hazard Analysis and Critical Control Point (HACCP) System
$15