NR NR/L2/MTC/10662 ISSUE 13 PDF

NR NR/L2/MTC/10662 ISSUE 13 PDF

Name:
NR NR/L2/MTC/10662 ISSUE 13 PDF

Published Date:
03/04/2023

Status:
[ Active ]

Description:

Process for the Creation of New or Revised Maintenance Regimes Using Reliability Centred Maintenance (RCM)

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$13.2
Need Help?
PDF ONLY

This standard is applicable to the development, and revision of maintenance regimes developed using the RCM analysis process.

Purpose 

This standard specifies the minimum requirements for the development and creation of new or revised maintenance regimes developed using Reliability Centred Maintenance (RCM) analysis techniques to develop scheduled maintenance plans that will provide an acceptable level of operability, with an acceptable level of risk, in an efficient and cost-effective manner.


Edition : 13
File Size : 2 files , 1.2 MB
Number of Pages : 18
Published : 03/04/2023

History

NR NR/L2/MTC/10662 ISSUE 13
Published Date: 03/04/2023
Process for the Creation of New or Revised Maintenance Regimes Using Reliability Centred Maintenance (RCM)
$13.2
NR NR/L2/MTC/10662 ISSUE 12
Published Date: 03/07/2020
Process for the Creation of New or Revised Maintenance Regimes Using Reliability Centred Maintenance (RCM)
$13.2

Related products

NR NR/CIV/SD/F003/1200/ADD2 ISSUE A
Published Date: 09/02/2017
Z-Type Underbridges - Form 003 Addendum 2
$18.6
NR E10000/161/9 ISSUE A
Published Date: 11/01/1993
W.R. Control Table - Example of G.F. Controls & Releases
$5.7
NR RT/E/S/21071 ISSUE 1
Published Date: 03/01/1998
Maintenance of Positive Electric Track Equipment (Including DC Feeder Cables)
$7.5
NR NR/L2/SIG/30014/D120/TS6-41 ISSUE 1
Published Date: 06/05/2021
Signalling Works Testing: Mk2 Rail Clamp Point Lock (RCPL) Wide to Gauge (WTG) Trap Points Signalling Works Test Specification
$7.5

Best-Selling Products