NR NR/L2/MTC/CP008/04 ISSUE 1 PDF

NR NR/L2/MTC/CP008/04 ISSUE 1 PDF

Name:
NR NR/L2/MTC/CP008/04 ISSUE 1 PDF

Published Date:
11/30/2020

Status:
[ Active ]

Description:

COVID-19 Works Contingency Plan: Returning to a Full Operational Service

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$13.2
Need Help?
PDF ONLY

The module covers:

a) Track, S&C and Off Track;

b) Traction Power/Power Distribution;

c) Telecoms;

d) Signalling;

e) Geotechnics, Structures, Tunnels and Buildings;

f) Plant;

g) Traction and Rolling Stock; and

h) Level Crossings.

Purpose 

This module provides guidance on the steps required to move between route Category Levels and reintroduce a full operational service to lines following a period of reduced maintenance, service reduction and/or de-energisation.


Edition : 1
File Size : 1 file , 250 KB
Number of Pages : 12
Published : 11/30/2020

History


Related products

NR NR/CIV/SD/458 ISSUE A
Published Date: 04/01/2008
Footbridge Access Chs Main Span Landing Option 2 with Future Ramp
$5.7
NR X74960 ISSUE 1
Published Date: 03/03/2012
MCB-OC(RTL) TYPICAL CIRCUITS PICTURE & MONITOR CONTROL CIRCUITS
$5.7
NR NR/CIV/SD/1342 ISSUE B01
Published Date: 03/01/2019
U-Type Underbridges: Bearings: Standard Bearing Details to 20m Non-VCRD Option
$5.7
NR NR/CIV/SD/476 ISSUE A
Published Date: 04/01/2008
Footbridge Access Truss Stair Main Span Landing Option 2 No Future Ramp
$5.7

Best-Selling Products

APSP 1-1991
Published Date:
Standard for Public Pools
APSP 5-2003
Published Date: 01/01/2003
Standard for Residential Inground Swimming Pools
APSP 6-1992
Published Date: 08/06/1992
Standard for Residential Portable Spas
APSP 7-2006
Published Date: 01/01/2006
American National Standard for Suction Entrapment Avoidance in Swimming Pools, Wading Pools, Spas, Hot Tubs, and Catch Basins
APSP 9-2005
Published Date: 2005
Standard for Acquatic Recreation Facilities