NR NR/L2/MTC/MG0012 ISSUE 6 PDF

NR NR/L2/MTC/MG0012 ISSUE 6 PDF

Name:
NR NR/L2/MTC/MG0012 ISSUE 6 PDF

Published Date:
09/01/2018

Status:
[ Inactive ]

Description:

Route Business (Non-Operations) Briefing Process (formerly NR/L3/MTC/MG0012)

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Czech version):
200 business days

SKU:
nr-nr-l2-mtc-mg0012-issue-6_2808379

Choose Document Language:
13.20 €
Need Help?
INACTIVE * PDF ONLY

This document applies to Route Business staff who:

a) work on the infrastructure to carry out inspection, maintenance, renewal or enhancement activities;

b) supervise and manage staff above at all levels in the organisation;

c) provide support activities (for example planning, resourcing, administration, safety, health, welfare and environment advice) ; and

d) employing managers of contracts administered by or for Network Operations which involve work on the railway infrastructure.

It also applies to staff in other functions who have defined accountabilities in this document (for example involved in contracts and procurement) and to other groups who operate under this process (for example a group in Route services delivering direct works on the infrastructure).

It specifically covers two processes:

1. a period safety brief to cascade key safety messages and information; and

2. a quarterly standards and controls awareness briefing process to brief changes to standards and controls.

The management of day-to-day correspondence or briefing of other ad hoc documents is not within the scope.

This process does not cover the requirements for Technical Briefing. They are set out in NR/L2/CSG/STP001.

Purpose

This standard describes the process for the briefing of general, safety and technical information to:

a) staff in Network Rail’s Route Businesses within the scope of this document; and

b) Maintenance contractors employed in contracts administered in Route Businesses.

The process is designed to achieve a thorough and consistent approach to briefing to mitigate the risk of staff (including contractors) not being made aware of key safety messages and changes to standards and controls.


Edition : 6
File Size : 1 file , 410 KB
Number of Pages : 15
Published : 09/01/2018

History


Related products

NR BRS-SM 875/1
Published Date: 11/22/1986
Location of Telephones Modified Box Assembly for Flashing White Light
5.70 €
NR NR/CIV/SD/3031 ISSUE P1
Published Date: 09/05/2009
Sheet 12 of 15 Details of Protective Mesh Panels to Front & Rear of Platforms & Intermediate Fence Posts
5.70 €
NR NR/CIV/SD/2143-1 ISSUE B
Published Date: 04/27/2012
Conarch Overbridge: Reinforcement Details 7.4m External Unit Left Skew 30°
5.70 €
NR NR/CIV/SD/2062 ISSUE B
Published Date: 04/27/2012
Conarch Overbridge: General Arrangement 9.4m External Unit Left Skew 15⁰
5.70 €

Best-Selling Products

UNE-CEN/TS 1099:2009 EX
Published Date: 06/24/2009
Plywood - Biological durability - Guidance for the assessment of plywood for use in different use classes
UNE-CEN/TS 12169:2009 EX
Published Date: 10/28/2009
Criteria for the assessment of conformity of a lot of sawn timber
UNE-CEN/TS 12200-2:2004
Published Date: 11/12/2004
Plastics rainwater piping systems for above ground external use - Unplasticized poly(vinyl chloride) (PVC-U) - Part 2: Guidance for the assessment of conformity
UNE-CEN/TS 12201-7:2007 EX
Published Date: 05/23/2007
Plastics piping systems for water supply - Polyethylene (PE) - Part 7: Guidance for the assessment of conformity
UNE-CEN/TS 12390-9:2008 EX
Published Date: 05/07/2008
Testing hardened concrete - Part 9: Freeze-thaw resistance - Scaling
UNE-CEN/TS 13001-3-1:2006 EX
Published Date: 06/14/2006
Cranes - General design - Part 3-1: Limit states and proof of competence of steel structures