NR NR/L2/MTC/MG0012 ISSUE 6 PDF

NR NR/L2/MTC/MG0012 ISSUE 6 PDF

Name:
NR NR/L2/MTC/MG0012 ISSUE 6 PDF

Published Date:
09/01/2018

Status:
[ Inactive ]

Description:

Route Business (Non-Operations) Briefing Process (formerly NR/L3/MTC/MG0012)

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$13.2
Need Help?
INACTIVE * PDF ONLY

This document applies to Route Business staff who:

a) work on the infrastructure to carry out inspection, maintenance, renewal or enhancement activities;

b) supervise and manage staff above at all levels in the organisation;

c) provide support activities (for example planning, resourcing, administration, safety, health, welfare and environment advice) ; and

d) employing managers of contracts administered by or for Network Operations which involve work on the railway infrastructure.

It also applies to staff in other functions who have defined accountabilities in this document (for example involved in contracts and procurement) and to other groups who operate under this process (for example a group in Route services delivering direct works on the infrastructure).

It specifically covers two processes:

1. a period safety brief to cascade key safety messages and information; and

2. a quarterly standards and controls awareness briefing process to brief changes to standards and controls.

The management of day-to-day correspondence or briefing of other ad hoc documents is not within the scope.

This process does not cover the requirements for Technical Briefing. They are set out in NR/L2/CSG/STP001.

Purpose

This standard describes the process for the briefing of general, safety and technical information to:

a) staff in Network Rail’s Route Businesses within the scope of this document; and

b) Maintenance contractors employed in contracts administered in Route Businesses.

The process is designed to achieve a thorough and consistent approach to briefing to mitigate the risk of staff (including contractors) not being made aware of key safety messages and changes to standards and controls.


Edition : 6
File Size : 1 file , 410 KB
Number of Pages : 15
Published : 09/01/2018

History


Related products

NR BRS-SM 875/1
Published Date: 11/22/1986
Location of Telephones Modified Box Assembly for Flashing White Light
$5.7
NR NR/CIV/SD/3031 ISSUE P1
Published Date: 09/05/2009
Sheet 12 of 15 Details of Protective Mesh Panels to Front & Rear of Platforms & Intermediate Fence Posts
$5.7
NR NR/CIV/SD/2143-1 ISSUE B
Published Date: 04/27/2012
Conarch Overbridge: Reinforcement Details 7.4m External Unit Left Skew 30°
$5.7
NR NR/CIV/SD/2062 ISSUE B
Published Date: 04/27/2012
Conarch Overbridge: General Arrangement 9.4m External Unit Left Skew 15⁰
$5.7

Best-Selling Products

NAIMA AH116
Published Date: 06/01/2002
FIBROUS GLASS DUCT CONSTRUCTION STANDARDS LOW VELOCITY SYSTEMS 2" w.g. (500 Pa) Maximum Static Pressure
$20.7