NR NR/L2/MTC/PL0056 ISSUE 2 PDF

NR NR/L2/MTC/PL0056 ISSUE 2 PDF

Name:
NR NR/L2/MTC/PL0056 ISSUE 2 PDF

Published Date:
06/01/2008

Status:
[ Inactive ]

Description:

Work and Possession Planning for the Railway Infrastructure (Meeting Management Pack)

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$24.3
Need Help?
INAC S/S BY NR/L2/NDS/202 * PDF ONLY

This specification is applicable to all functions that plan work and access on the railway infrastructure, including Infrastructure Maintenance, Infrastructure Investment, National Delivery Service, Integrated Planning Group and Operations & Customer Service. This includes the planning of engineering trains for maintenance, renewals and major projects activity. It does not cover the planning of train services for Network Rail's passenger and freight customers.

Purpose

This cross-functional procedure describes the series of meetings that are required to bring together the planning of work and access on the railway infrastructure. It is an outline of the planning process but not a fully developed process. Each function of Network Rail shall establish their own functional procedures to implement planning within the framework defined by this document.

The text of the procedure itself is a brief explanation of the meetings and the activities that have to occur between them. For full details of the meetings refer to Appendix A "Work and possession planning process: meetings management pack". This describes the purpose of the meetings, attendees plus inputs to and outputs from them.


Edition : 2
File Size : 1 file , 930 KB
Number of Pages : 61
Published : 06/01/2008

History


Related products

NR TWI 3S038 ISSUE 1
Published Date: 03/01/2005
How to Define and Measure the knuckle stagger
$5.7
NR NR/L2/OPS/250 ISSUE 8
Published Date: 06/05/2021
Network Rail National Emergency Plan
$13.2
NR NR/L3/OCS/044/MS-38 ISSUE 3
Published Date: 06/04/2011
Managed Station Manual: Safe System of Working on Station Roofs
$5.7
NR NR/L3/MTC/RCS0216 ISSUE 26
Published Date: 06/03/2023
Risk Control Manual
$18.6

Best-Selling Products

UTS AppPack TK5.0 IRF
Published Date:
AppPack TK Solver 5.0 Standard (Standalone) and Interactive Roark's Formulas
UTS INTERACTIVE ROARK
Published Date:
Interactive Roark's Formulas (Standalone)
UTS MATHLOOK
Published Date:
MathLook for Excel (TM)
UTS ROARK FOR EXCEL
Published Date:
Roark’s Formulas for Excel (TM): Control your stress
UTS TK5.0
Published Date:
TK Solver 5.0 Standard (Standalone)