NR NR/L2/MTC/PL0175/MOD04 ISSUE 2 PDF

NR NR/L2/MTC/PL0175/MOD04 ISSUE 2 PDF

Name:
NR NR/L2/MTC/PL0175/MOD04 ISSUE 2 PDF

Published Date:
03/03/2018

Status:
[ Revised ]

Description:

Infrastructure Maintenance Planning Handbook: Daily and Weekly Visualisation Control Room Meetings

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$7.5
Need Help?
INACTIVE FOR NEW DESIGN * PDF ONLY

This module applies to:

a) Maintenance Section Managers;

b) Planner(s);

c) Supervisor(s);

d) Technical Support Staff;

e) Team Leader(s);

f) Technician(s); and

g) Operative(s).

It applies when planning and performing safety critical work. It mandates the daily and weekly meetings and review of the work to be allocated to the teams and volumes complete with issues that have arisen, if any. For the weekly meeting there are additional checks and controls to fully manage a section.

These meetings are mandatory although the items included might vary according to the work being done.

NOTE: Both meetings take place in the same Visualisation Control Room.

Purpose

This module sets out the process to prepare a fully updated Section Control Room so it is available for the daily and weekly visualisation control room meetings.


Edition : 2
File Size : 1 file , 220 KB
Number of Pages : 6
Published : 03/03/2018

History


Related products

NR NR/L3/OPS/045 ISSUE 28
Published Date: 07/01/2023
National Operating Procedures Index
$18.6
NR BRS-SM 5868 ISSUE A
Published Date: 01/29/1991
Apparatus Case Small Parts List for Interior Framework Assembly (MK2)
$5.7
NR NR/L2/SIG/11201/MOD A3-10 ISSUE 1
Published Date: 06/02/2018
Signalling Design Handbook: Signalling Scheme Plans Best Practice
$7.5
NR BRS-SM 2371/13&17 ISSUE A
Published Date: 03/01/1996
Mechanical Supplementary Drive Mounted in 4' for UIC-54B EVS Layout with 3rd Rail Clamp Lock or Point M/C Operated
$5.7

Best-Selling Products