NR NR/L2/OHS/019/01 ISSUE 2 PDF

NR NR/L2/OHS/019/01 ISSUE 2 PDF

Name:
NR NR/L2/OHS/019/01 ISSUE 2 PDF

Published Date:
06/03/2023

Status:
[ Active ]

Description:

Safety of People at Work on or Near the Line: Module 01 - Planning and Working for Fault, Failure, and Incident Response

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$7.5
Need Help?
PDF ONLY

This module covers the additional considerations for planning a Safe System of Work (SSoW) for fault, failure, or Incident Response where: 

a) the planning processes and timescales within NR/L2/OHS/019 cannot be used;

b) a fault, incident number has been generated by Route/Fault Control; or

c) a Rail Incident Officer (RIO) or Pilot, Hand-Signaller, or other competent roles as appropriate, are appointed for an emergency or failure.

This module applies to responsible managers (RM), planners, persons in charge(person in charge) and anyone involved in the planning and working during incident response.

For the purpose of this module, safe work packs (SWP) are collectively referred to as Incident Response Packs (IRP)

The person responding to contact by Route/Fault Control will normally be the person in charge


Edition : 2
File Size : 1 file , 240 KB
Number of Pages : 7
Published : 06/03/2023

History

NR NR/L2/OHS/019/01 ISSUE 2
Published Date: 06/03/2023
Safety of People at Work on or Near the Line: Module 01 - Planning and Working for Fault, Failure, and Incident Response
$7.5
NR NR/L2/OHS/019/01 ISSUE 1
Published Date: 03/04/2017
Safety of People at Work on or Near the Line: Module 01 - Planning and Working During Incident Response
$7.5

Related products

NR NR/PS/ELP/27182 ISSUE 2
Published Date: 04/01/2006
Insulating Shroud for Foot of Conductor Rail (aka NR/SP/ELP/27182)
$13.2
NR NR/GN/SIG/19054-2 ISSUE 2
Published Date: 12/01/2009
SSI Technicians Manual Part 2 System Description
$5.7
NR NR/SP/ELP/21019 ISSUE 2
Published Date: 12/01/2005
Specification for Transformer and Rectifier Equipments for d.c. Traction Substations
$18.6
NR T25140 ISSUE 2
Published Date: 09/11/1997
Lineside & on Track Equipment Typical Circuits Points Detection Summation Circuits (1). Hydraulic Operation
$5.7

Best-Selling Products