1.1 This module applies to the planner, responsible manager (RM) and the person in charge (person in charge).
1.2 This module describes the additional requirements for planning for:
a) Complex site of work
b) Possessions
c) Worksites
1.3 Where a sharing of a line blockage is required, go to Module 03 – Planning & working using protection arrangements and warning systems.
1.4 This module excludes where work is segregated from the railway, such as platform works and work within the area referred to as ‘lineside’, use NR/L2/OHS/00130 - Creating a Site of Work Segregated from the Railway.