Name:
NR NR/L2/OPS/060 ISSUE 3 PDF
Published Date:
03/05/2010
Status:
[ Active ]
Publisher:
Network Rail
Where weather forecasts or local intelligence indicate Hot Weather for the following day that will be likely to require the imposition of ESRs, then this procedure shall apply.
This procedure shall apply for:
a) Exceptionally Hot Weather, where air temperature requires blanket speed restrictions
b) Hot weather, where rail temperature requires site-specific speed restrictions
c) Hot weather, where air temperature requires asset-specific speed restrictions
Hot Weather related ESR might be required to mitigate risks associated with:
a) Track buckles
b) Track circuit failures
c) Points failures (through loss of detection)
d) Overhead line sag
e) Overheating relay rooms
This procedure shall be managed in line with the general style of standard NR/CS/OPS/021 Weather - Managing the Operational Risks, and shall normally require the implementation of the Extreme Weather Action Team (EWAT) plan for Red Alert status.
Route Directors, Route Control Managers, Route/Area Operations Managers and Infrastructure Maintenance Delivery Managers shall make their staff aware of their roles in these arrangements.
In areas signalled by ERTMS, lineside boards are not provided for ESR and speed restrictions are imposed using the signalling system. Speeds are specified in kilometres per hour (km/h) and the rules are shown in GE/RT8000/SP ERTMS. The provisions of this procedure apply, enhanced as necessary by Local instructions.
Purpose
This document states the procedure for the management of heat related Emergency Speed Restrictions (ESR) resulting from a forecast of Hot Weather. The purpose of the standard is to maintain operational safety yet reduce the performance impact of unnecessary heat related blanket ESR. This procedure supports NR/CS/OPS/021.
| Edition : | 3 |
| File Size : | 1 file , 400 KB |
| Number of Pages : | 13 |
| Published : | 03/05/2010 |