NR NR/L2/OPS/060 ISSUE 3 PDF

NR NR/L2/OPS/060 ISSUE 3 PDF

Name:
NR NR/L2/OPS/060 ISSUE 3 PDF

Published Date:
03/05/2010

Status:
[ Active ]

Description:

The Management of Heat Related Emergency Restrictions of Speed Resulting from High Air Temperatures

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$13.2
Need Help?
PDF ONLY

Where weather forecasts or local intelligence indicate Hot Weather for the following day that will be likely to require the imposition of ESRs, then this procedure shall apply.

This procedure shall apply for:

a) Exceptionally Hot Weather, where air temperature requires blanket speed restrictions

b) Hot weather, where rail temperature requires site-specific speed restrictions

c) Hot weather, where air temperature requires asset-specific speed restrictions

Hot Weather related ESR might be required to mitigate risks associated with:

a) Track buckles

b) Track circuit failures

c) Points failures (through loss of detection)

d) Overhead line sag

e) Overheating relay rooms

This procedure shall be managed in line with the general style of standard NR/CS/OPS/021 Weather - Managing the Operational Risks, and shall normally require the implementation of the Extreme Weather Action Team (EWAT) plan for Red Alert status.

Route Directors, Route Control Managers, Route/Area Operations Managers and Infrastructure Maintenance Delivery Managers shall make their staff aware of their roles in these arrangements.

In areas signalled by ERTMS, lineside boards are not provided for ESR and speed restrictions are imposed using the signalling system. Speeds are specified in kilometres per hour (km/h) and the rules are shown in GE/RT8000/SP ERTMS. The provisions of this procedure apply, enhanced as necessary by Local instructions.

Purpose

This document states the procedure for the management of heat related Emergency Speed Restrictions (ESR) resulting from a forecast of Hot Weather. The purpose of the standard is to maintain operational safety yet reduce the performance impact of unnecessary heat related blanket ESR. This procedure supports NR/CS/OPS/021.


Edition : 3
File Size : 1 file , 400 KB
Number of Pages : 13
Published : 03/05/2010

History


Related products

NR BRS-SM 511 ISSUE A
Published Date: 07/20/1986
Rail Clamp Point Lock Adaptor Block Assembly for FB Inclined Track
$5.7
NR NR/L2/SIG/30081 ISSUE 1
Published Date: 09/05/2009
Axle Counter System Design Principles & Generic Application Rules
$18.6
NR BRS-SM 52335 ISSUE F
Published Date: 02/08/1996
Mechanical Supplementary Drive Mounted In 6' on Timber for UIC-54B Plain Lead Point layouts. Clamp lock or point M/C operated
$5.7
NR RT/E/P/27149 ISSUE 1
Published Date: 12/01/2004
Installation of Preformed Splices for Aluminium and AWAC Conductors
$7.5

Best-Selling Products

IME SLP 12
Published Date: 03/01/2018
Glossary of Commercial Explosives Industry Terms
$12.6
IME SLP 12
Published Date: 05/01/2013
Glossary of Commercial Explosives Industry Terms
IME SLP 12
Published Date: 02/01/2007
Glossary of Commercial Explosives Industry Terms
IME SLP 14
Published Date: 04/01/2007
Handbook for the Transportation and Distribution of Explosive Materials
IME SLP 14
Published Date: 03/01/2019
Handbook for the Transportation and Distribution of Explosive Materials
$15
IME SLP 17
Published Date: 03/01/2007
Safety in the Transportation, Storage, Handling and Use of Explosive Materials