NR NR/L2/OPS/085 ISSUE 5 PDF

NR NR/L2/OPS/085 ISSUE 5 PDF

Name:
NR NR/L2/OPS/085 ISSUE 5 PDF

Published Date:
06/03/2017

Status:
[ Inactive ]

Description:

Permissive Platform Working

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$13.2
Need Help?
INACTIVE * PDF ONLY

This business process covers all permissive platform signalled moves including:

a) contingency arrangements;

b) attaching and detaching to / from passenger trains (including where one portion is Empty Coaching Stock (ECS));

c) platform sharing;

d) terminal stations;

e) Permissive Platform (PP);

f) Permissive Platform Contingency purposes (PP-C);

g) Permissive Platform Attaching / Detaching movements (PP-A).

During significant service disruption permissive platform working would allow:

a) increased line capacity, e.g. by attaching two trains together;

b) passengers to make alternative travel arrangements;

c) passengers to use the station’s facilities;

d) clearance of heavily delayed trains to be expedited;

e) reduce the risk of passengers self-evacuating.

This business process does not cover:

a) permissive non passenger train movements;

b) attaching / detaching to / from ECS trains (shunting with the authority of a ground position signal);

c) locomotives either changing ends or being changed;

d) assistance to failed trains.

Purpose

This business process defines the requirements for signalling two trains when the second is signalled onto a running line which is already occupied.

The business process:

a) controls the risk so far as reasonably practicable of train collisions when signalled in accordance with the permissive working arrangements; and

b) allows permissive working to be conducted in a safe manner and with an assessment of all the factors that might affect a driver’s ability to perform this manoeuvre satisfactorily.


Edition : 5
File Size : 1 file , 480 KB
Number of Pages : 13
Published : 06/03/2017

History


Related products

NR NR/L3/ELP/27240/NR/DIST C10G(C) ISSUE 3
Published Date: 03/01/2017
Routine Inspection and Secondary Injection Testing of CAG19 Instantaneous Overcurrent and Earth Fault Relays on VCBs Using ZFB Test Set
$5.7
NR NR/L3/CIV/140/022N ISSUE 1
Published Date: 05/01/1997
Model Clause 022N: Land & Trackwork Surveys
$13.2
NR E10000/0/2A ISSUE 2
Published Date: 11/15/1990
Typical Interlocking Circuits General Notes (2)
$5.7
NR X08200 ISSUE 3
Published Date: 12/01/2008
AHBC Typical Circuits Multi Crossing Indicator Unit, Faceplate Detail
$5.7

Best-Selling Products

AABC BASIC-PSYCHROMETRICS
Published Date:
TABpro Training Series Video - Basic Psychrometrics
$57.6
AABC BUNDLE
Published Date:
TABpro Training Series Video - Bundle (VAV, Duct Leakage & Psychrometrics)
$224.7
AABC DIRECTORY
Published Date: 01/01/2011
Directory
AABC DIRECTORY
Published Date: 01/01/2012
Directory
AABC DUCT LEAKAGE
Published Date:
TABpro Training Series Video - Duct Leakage and Pressure Decay Testing
$96
AABC KAHOE FIELD MANUAL
Published Date:
Kahoe Test and Balance Field Manual
$45.6