NR NR/L2/OPS/095 ISSUE 6 PDF

NR NR/L2/OPS/095 ISSUE 6 PDF

Name:
NR NR/L2/OPS/095 ISSUE 6 PDF

Published Date:
06/01/2019

Status:
[ Active ]

Description:

High Risk Sites for Wrong Side Track Circuit Failures in Leaf Fall Areas and for Low Rail Adhesion

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$13.2
Need Help?
PDF ONLY

This business process sets out the assessment processes for identifying high risk sites in respect of wrong side track circuit failures under leaf fall contamination conditions. It is to be used by Regions and Routes to enable appropriate action to be taken in accordance with GO/RT3208 In this respect, the requirements of this business process apply where track circuits are used to detect the presence of trains

This business process describes the assessment processes for identifying a high risk site in respect of conditions of low adhesion between the wheel and the rail, and is to be used by Regions and Routes to enable appropriate action to be taken in accordance with GE/RT8040

This standard contains a risk assessment process for prioritizing high risk sites and deciding on actions or mitigations to reduce the risk so far as is reasonably practicable (SFAIRP). It may be used by Regions and Routes to enable appropriate action to be taken in accordance with RIS-0386-CCS

Purpose

The purpose of this business process is to identify, risk rank and create a removal plan for any location which may be classified as a high risk site in respect of likely occurrences of wrong side track circuit failures (WSTCFs) under leaf fall contamination conditions.

The removal of these high risk sites through effective mitigation will reduce the impact to safety and performance of WSTCFs during the autumn season. The removal of high risk sites of low rail adhesion reduces the probability of a low adhesion-related incident, such as a station overrun or signal passed at danger (SPAD), and the safety and performance impact of such an incident.

This process will allow the classification of high risk sites in respect of conditions of low rail adhesion between the wheel and the rail on Network Rail Managed Infrastructure.

 

 

 


Edition : 6
File Size : 1 file , 500 KB
Number of Pages : 17
Published : 06/01/2019

History


Related products

NR RT/E/C/19041 ISSUE 1
Published Date: 02/01/2001
Signalling Equipment Technical Advice Notice (SIGTAN041) - Battery Cells (aka NR/GN/SIG/19041)
$13.2
NR BRS-SM 2073
Published Date: 08/05/1991
Colour Light Signals Clamping Bracket for Netting
$5.7
NR TEF 3023 ISSUE 2
Published Date: 06/01/2008
Engineer Cab Ride Report
$5.7
NR NR/L2/CTM/012/043 ISSUE 1
Published Date: 03/06/2010
Sig 43: Joint and terminate cables and wires
$5.7

Best-Selling Products

ISO/IWA 1:2005
Published Date: 10/01/2005
Quality management systems - Guidelines for process improvements in health service organizations
$39.6
ISO/IWA 11:2012
Published Date: 2012
Guidelines for evaluating cookstove performance
$13.5
ISO/IWA 12:2013
Published Date: 12/15/2013
Guidelines on the application of ISO 9001:2008 in policing organizations
$55.5
ISO/IWA 13:2014
Published Date: 11/15/2014
Multiple resource evaluation guideline
$23.1
ISO/IWA 14-1:2013
Published Date: 11/15/2013
Vehicle security barriers - Part 1: Performance requirement, vehicle impact test method and performance rating
$63
ISO/IWA 14-2:2013
Published Date: 11/15/2013
Vehicle security barriers - Part 2: Application
$71.1