NR NR/L2/OPS/253 ISSUE 1 PDF

NR NR/L2/OPS/253 ISSUE 1 PDF

Name:
NR NR/L2/OPS/253 ISSUE 1 PDF

Published Date:
03/07/2020

Status:
[ Active ]

Description:

Specification for Rail Operating Centres

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$24.3
Need Help?
PDF ONLY

This specification defines the requirements for the design of a Rail Operating Centres (ROC).

This specification applies to ROCs:

1) built after December 2019; and

2) buildings being converted into a ROC.

The specification applies to the technical requirements of the ROC to enable the safe and efficient operation of the building. The specification allows the development of operational concepts for each ROC.

For existing ROCs, not in the process of being converted, only clause 4.1 applies.

The specification applies to all Routes.

The specification does not include:

1) cyber security requirements for ROCs.

2) methods or processes for determining numbers of people required on site; or

3) operational processes, principles and behaviors.

NOTE: For example, with regard to Train Operating Companies (TOCs).

Purpose

The purpose of the specification is to bring together the technical requirements of the building, with the operational requirements of the Route and the personal needs of the individuals, which allow the ROC to operate effectively. So that the ROC can respond to different levels of occupation by signalling, control and electrical control teams, and to the introduction of new technology.

The purpose of the specification is to provide a consistent approach to develop operational concepts for new or refurbished ROC. It provides a baseline for existing ROC buildings to allow each Route to develop improvement plans where necessary.

This will enable the Routes to manage the risks associated with the delivery of an operable and efficient environment to operate the railway.


Edition : 1
File Size : 1 file , 1000 KB
Number of Pages : 82
Published : 03/07/2020

History


Related products

NR NR/L3/ELP/27240/NR/DIST C33J ISSUE 3
Published Date: 06/03/2023
Maintenance of ABB SMOS Light 25kV Switchgear Pallets and Busbars
$18.6
NR BRS-SM 3204 ISSUE A
Published Date: 04/15/2014
Machine Operated Point Layout with Tubular Stretcher Bars - Full Depth CV Switches CEN56/CEN56 (113A FB) - Mechanical Supplementary Drive Mounted in 4 Foot
$5.7
NR NR/L3/ELP/27240/NR/DIST C10H ISSUE 3
Published Date: 03/01/2017
Routine Inspection and Secondary Injection testing of F.G.L Instantaneous Attracted Armature Relay
$5.7
NR NR/SMTH/PART 02 ISSUE 13
Published Date: 12/02/2023
Signal Maintenance Testing Handbook (SMTH): Part 02
$24.3

Best-Selling Products