NR NR/L2/OPS/254/01 ISSUE 1 PDF

NR NR/L2/OPS/254/01 ISSUE 1 PDF

Name:
NR NR/L2/OPS/254/01 ISSUE 1 PDF

Published Date:
12/02/2017

Status:
[ Active ]

Description:

Manual for the Principles of Operational Simulation - Module 01: Signalling Simulation Operational Specification

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$13.2
Need Help?
PDF ONLY

The scope of the technical specification is for all new and proposed signalling simulation equipment but does not mandate the requirements on existing simulation

The scope is primarily for VDU based signalling control systems (VSCS) although where required the content can be used for other simulation for NX panels and lever frame simulators.

It does not cover other operational systems used by the signaller such as communications and traffic management. There will be an interface requirement between the signalling and communications simulators.

This technical specification details the mandatory functionality required of signalling simulation systems. The particular combinations will depend on the specific uses of each system and the training requirements for the location.

Purpose

This technical specification states the specific requirements for signalling control system simulation to test the operability of the system, to deliver training and to manage ongoing competence. The document provides a framework that matches requirements to the levels of simulation detailed in NR/L2/OPS/254. The purpose of the specification is to provide consistent minimum functionality of equipment for the initial and ongoing professional development of signallers.


Edition : 1
File Size : 1 file , 380 KB
Number of Pages : 11
Published : 12/02/2017

History


Related products

NR NR/L2/SIG/11201/MOD A3-5 ISSUE 1
Published Date: 06/02/2018
Signalling Design Handbook: Signal Spacing Parameters
$7.5
NR X70055 ISSUE 4
Published Date: 04/07/2007
MCB Typical Circuits Absent Circuits
$5.7
NR NR/L3/MTC/PL0175/00 ISSUE 1
Published Date: 09/04/2010
Infrastructure Maintenance Planning Handbook - Maintenance Work Planning Introduction & Guidance
$18.6
NR NR/SIN/204 ISSUE 1
Published Date: 06/17/2021
Special Inspection Notice of Operational Property Buildings for Inspection of Pitched Roofs Gable Walls
$13.2

Best-Selling Products

NTCIP 1101:1996
Published Date: 1996
Simple Transportation Management Framework
$27.6
NTCIP 1102:2004
Published Date: 2005
Octet Encoding Rules (OER) Base Protocol
$41.1
NTCIP 1103 - 2010
Published Date: 2010
Transportation Management Protocols (TMP)
$61.2
NTCIP 1104 v01
Published Date: 2009
Center-to-Center Naming Convention Specification
$21.6
NTCIP 1201:2005
Published Date: 01/01/1997
Global Object (GO) Definitions
$48.6
NTCIP 1201:2011
Published Date: 04/01/2011
Global Object (GO) Definitions
$62.1