Name:
NR NR/L2/OPS/254 ISSUE 1 PDF
Published Date:
12/02/2017
Status:
[ Active ]
Publisher:
Network Rail
The scope of the document covers all new and proposed operational simulation. The document does not mandate the requirements on existing simulation but each Route should consider a programme to bring current simulation to the same specification.
A Level 2 Technical Specification Manual will provide the scope of the specification for each area and will include:
Module 01 Signalling Simulation Operational Specification
Module 02 Electrical Control equipment
Module 03 Communications equipment
Module 04 Traffic Management
Module 05 Future operational systems
Purpose
This business process states the principal requirements for operational simulation to test the operability of systems, deliver training and manage ongoing competence. The document provides a framework that matches levels of simulation to the delivery of operational competence outcomes. The document provides clarity on the level of simulation required to provide competent staff and reduce the risk of operational errors in safety critical roles.
| Edition : | 1 |
| File Size : | 1 file , 810 KB |
| Number of Pages : | 15 |
| Published : | 12/02/2017 |