NR NR/L2/OTK/5100 ISSUE 4 PDF

NR NR/L2/OTK/5100 ISSUE 4 PDF

Name:
NR NR/L2/OTK/5100 ISSUE 4 PDF

Published Date:
03/06/2021

Status:
[ Revised ]

Description:

Boundary Measure Management Manual

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$13.2
Need Help?
PDF ONLY

This manual is applicable to all involved in the management of boundary measures and describes the requirements for:

a) boundary measure classifications;

b) boundary measure specifications;

c) a register of assets;

d) inspection of boundary measures protecting Network Rail’s operational infrastructure, depots and adjacent railway facilities;

e) inspection of boundary measures protecting Network Rail’s disused and closed lines and other non-operational land;

f) inspection of third party owned boundary measures which are used to control unauthorised access to the railway;

g) maintaining the boundary;

h) degradation and renewal;

i) risk assessment;

j) response and rectification timescales;

k) investigation of incidents; and

l) prioritisation of works.

Not included within this manual are:

i. security measures that do not form part of the boundary;

ii. retaining walls (see NR/L3/CIV/006/5A, Retaining Walls);

iii. vehicle containment (see NR/L3/CIV/00012, Road Vehicle Incursions: Risk

Assessment of Public and Non-Public Bridge and Neighbouring Sites);

iv. acoustic fences (barriers);

v. touch potential barriers;

vi. boundary measures forming part of a station or depot lease agreement.

Purpose

The Management of the Boundary Measure

The management of the boundary measure is a process using risk assessment that contributes to the safe performance of the railway infrastructure and our duty of care to the public. Loss of an effective boundary measure affects the safety and performance of the railway.

Management is required to assess that:

a) the boundary measure adequately delineates Network Rail property from that of a third party or adjacent railway facility;

b) the boundary measure provides a continuous barrier that is adequate to deter threats of trespass and livestock incursion onto Network Rail property from the adjacent land where they are reasonably foreseeable; and

c) the construction of the barrier is of sufficient design in relation to the threat that is expected from the adjacent land use.

Bow Tie Threats

The bow-tie threats (see NR/GN/OTK/5000/002, People and Livestock – Loss of boundary measure) to continuous effective boundary measures are:

a) deliberate damage from acts of trespass and vandalism;

b) non-deliberate damage from livestock which includes most domesticated animals kept on land (commonly, horse, cattle, sheep, pig and goat);

c) non-deliberate damage from road vehicles or fallen objects including trees;

d) non-malicious acts by railway personnel;

e) unchecked asset degradation leading to failure of components;

f) inappropriate boundary measure specification, dimension or components that do not adequately deter trespass or incursion;

g) change in land use and railway characteristics that will increase the likelihood or consequence of an incident; and

h) effectiveness of boundary measure reduced by external occurrence such as change in ground level next to the boundary due to landslip, snow loading, wind-loading, waterlogging and washout of footings.


Edition : 4
File Size : 1 file , 51 MB
Number of Pages : 20
Published : 03/06/2021

History

NR NR/L2/OTK/5100 ISSUE 5
Published Date: 09/03/2022
Boundary Measure Management Manual
$18.6
NR NR/L2/OTK/5100 ISSUE 4
Published Date: 03/06/2021
Boundary Measure Management Manual
$13.2
NR NR/L2/OTK/5100 ISSUE 3
Published Date: 03/07/2020
Boundary Measures Manual
$13.2

Related products

NR TWI 2P037 ISSUE 1
Published Date: 03/01/2005
How to Pull Through a Timber Sleeper
$5.7
NR SMF/PL/0038 ISSUE 1
Published Date: 02/01/2006
Notice (SCO)
$5.7
NR NR/CIV/SD/1950 ISSUE D
Published Date: 12/01/2018
Underbridge Walkways: Others: Protective Treatment Details
$5.7
NR X70020 ISSUE 4
Published Date: 04/07/2007
MCB Typical Circuits (Non CCTV) Control & Indication Circuits
$5.7

Best-Selling Products

CGSB 1-GP-151M
Published Date: 03/01/1980
Standard for Coating, Interior, Intumescent, Fire Retardant
Free Download
CGSB 1-GP-151M
Published Date: 03/01/1980
Revetement de peinture, interieur, intumescent, ignifuge
Free Download
CGSB 1-GP-180MA
Published Date: 02/01/1996
Coating, Polyurethane, Two-Package, General Purpose
Free Download
CGSB 1-GP-180MA
Published Date: 02/01/1996
Revetement de polyurethanne, a deux constituants separes, pour utilisation generale
Free Download
CGSB 1-GP-191M AMEND.
Published Date: 03/01/1981
Enamel, Automotive Refinishing, Fast Drying, Gloss
CGSB 1-GP-191M AMEND.
Published Date: 03/01/1981
Peinture-email brillante, a sechage rapide, pour le repeinturage des carrosseries de vehicules automobiles