NR NR/L2/P3M/201 ISSUE 1 PDF

NR NR/L2/P3M/201 ISSUE 1 PDF

Name:
NR NR/L2/P3M/201 ISSUE 1 PDF

Published Date:
03/06/2021

Status:
[ Revised ]

Description:

Project Acceleration in a Controlled Environment (PACE)

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$13.2
Need Help?
PDF ONLY

This Network Rail standard specifies:

a) the PACE lifecycle and phases;

b) PACE milestones;

c) PACE Products; and

d) Phase Readiness Reviews.

This standard is part of the Capital Delivery Core Process and relates to NR/L1/INI/P3M/100.

It applies to projects that require Investment Authority as defined within IR01 Investment Regulations and enhance or renew the operational railway.

Purpose

Project Acceleration in a Controlled Environment (PACE) describes how Network Rail manages and controls investment projects on the rail network.

Network Rail has developed this approach to managing projects in order to minimise and mitigate the risks associated with project development and delivery.

The approach is based on best practice within comparable industries that undertake major investment projects.

Implementation of this standard will reduce the reputational and financial risk related to the delivery of complex projects.

PACE provides a more flexible control framework enabling Sponsors and Project Managers to tailor the controls herein to better meet the requirements of their project.


Edition : 1
File Size : 1 file , 450 KB
Number of Pages : 19
Published : 03/06/2021

History

NR NR/L2/P3M/201 ISSUE 2
Published Date: 09/03/2022
Project Acceleration in a Controlled Environment (PACE)
$18.6
NR NR/L2/P3M/201 ISSUE 1
Published Date: 03/06/2021
Project Acceleration in a Controlled Environment (PACE)
$13.2

Related products

NR NR/L3/SIG/10064/GI/E005 ISSUE 3
Published Date: 09/04/2021
General Instructions to Staff Working on S&T Equipment: Segregation of Wiring
$5.7
NR NR/L2/TRK/6100/MOD09 ISSUE 3
Published Date: 06/03/2023
The Installation and Maintenance of Stretcher Bars: Stretcher Bar Equipment Catalogue
$18.6
NR NR/SP/ELP/21030 ISSUE 2
Published Date: 12/01/2005
Specification for Prefabricated and Modular Steel Housings for Electrical Distribution Equipment
$18.6
NR NR/L2/SIG/11752/PART S ISSUE 1
Published Date: 09/04/2021
Train Detection Handbook Part S: Dimensions
$13.2

Best-Selling Products

ITU-R 27
Published Date: 01/01/1993
HF Field-Strength Measurement Campaign
$8.4
ITU-R 346-1
Published Date: 01/01/1970
(WITHDRAWN) Four-Frequency Diplex Systems - Section 3Ca - Radiotelegraph Circuits
$0.3
ITU-R 41-1 FRENCH
Published Date: 01/01/2000
Collaboration avec l'Organisation internationale de normalisation (ISO) et la Commission électrotechnique internationale (CEI) sur les techniques de la radiodiffusion
ITU-R 41-1 SPANISH
Published Date: 01/01/2000
Colaboración con la Organización Internacional de Normalización (ISO) y la Comisión Electrotécnica Internacional (CEI) sobre tecnologías de radiodifusión
ITU-R 903-2 SPANISH
Published Date: 01/01/1990
TRANSMISIÓN DIGITAL EN EL SERVICIO MÓVIL TERRESTRE
ITU-R 917-2 SPANISH
Published Date: 01/01/1990
NIVELES ADMISIBLES DE INTERFERENCIA EN LOS CANALES TELEFÓNICOS DEL SERVICIO MÓVIL MARÍTIMO POR SATÉLITE