NR NR/L2/P3M/225 ISSUE 1 PDF

NR NR/L2/P3M/225 ISSUE 1 PDF

Name:
NR NR/L2/P3M/225 ISSUE 1 PDF

Published Date:
06/05/2021

Status:
[ Revised ]

Description:

Project Acceleration in a Controlled Environment (PACE) - Manage Assurance

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$18.6
Need Help?
PDF ONLY

This standard specifies the processes and roles and responsibilities associated with assurance of capital delivery projects, programmes and portfolios.

This standard is part of the Capital Delivery core process and relates to NR/L2/P3M/201.

It applies to projects that require Investment Authority as defined within IR01 Investment Regulations and enhance or renew the operational railway.

Purpose

The Project, Programme and Portfolio management (P3M) framework policy and Project Acceleration in a Controlled Environment (PACE) describe how Network Rail manages and controls investment projects on the rail network.

Network Rail has developed this approach to managing projects in order to minimise and mitigate the risks associated with project development and delivery. PACE provides a more flexible control framework enabling sponsors and project managers to tailor the controls therein to better meet the requirements of their project. The PACE framework is shown in figure 1.

The approach is based on best practice within comparable industries that undertake major investment projects.

This standard describes the Network Rail assurance activities undertaken in relation to the project, programme and portfolio management of the capital delivery portfolio. The assurance activities provide Network Rail with oversight and confidence in the progress of its portfolio (renewals and enhancements). It creates a common set of working practices to assure Network Rail’s portfolio, projects and programmes.


Edition : 1
File Size : 1 file , 1.1 MB
Number of Pages : 21
Published : 06/05/2021

History

NR NR/L2/P3M/225 ISSUE 2
Published Date: 12/03/2022
Project Acceleration in a Controlled Environment (PACE) - Manage Assurance
$13.2
NR NR/L2/P3M/225 ISSUE 1
Published Date: 06/05/2021
Project Acceleration in a Controlled Environment (PACE) - Manage Assurance
$18.6

Related products

NR NR/L3/OCS/044/FS-02C ISSUE 1
Published Date: 06/04/2011
Managed Station Manual: Guidance for the Use & Processing of References
$5.7
NR TWI 2G014 ISSUE 1
Published Date: 03/01/2005
How To Use a Cross Level Transfer Gauge
$5.7
NR BRS-SM 153
Published Date: 08/18/1988
Colour Light Signals Plate - Adaptor Position Light Subsidiary & Shunting Signals for Posts & Spigots of 76 O/Dia.
$5.7
NR T34036 ISSUE 7
Published Date: 06/07/2003
Lineside & on Track Equipment Typical Circuits TPWS - Control Circuits for Fitment to SSI Signalling - Method 3 (2 Aspect with Subsidiary)
$5.7

Best-Selling Products

AI/ASPHALT AI MS-16
Published Date: 03/01/1983
ASPHALT IN PAVEMENT PRESERVATION & MAINTENANCE
AI/ASPHALT AI MS-17
Published Date: 01/01/1969
ASPHALT OVERLAYS FOR HIGHWAY AND STREET REHABILITATION
AI/ASPHALT AI MS-17
Published Date: 06/01/1983
ASPHALT OVERLAYS FOR HIGHWAY AND STREET REHABILITATION
AI/ASPHALT AI MS-17
Published Date: 01/01/2000
ASPHALT OVERLAYS FOR HIGHWAY AND STREET REHABILITATION
AI/ASPHALT AI MS-1
Published Date: 01/01/2008
THICKNESS DESIGN ASPHALT PAVEMENTS FOR HIGHWAYS & STREETS
$19.5
AI/ASPHALT AI MS-22
Published Date: 01/01/1983
CONSTRUCTION OF HOT MIX ASPHALT PAVEMENTS
$8.7