NR NR/L2/RMVP/0200/P003 ISSUE 2 PDF

NR NR/L2/RMVP/0200/P003 ISSUE 2 PDF

Name:
NR NR/L2/RMVP/0200/P003 ISSUE 2 PDF

Published Date:
03/03/2012

Status:
[ Revised ]

Description:

Plant Operations Manual: Planning and undertaking Lifting Operations

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$13.2
Need Help?
PDF ONLY

This standard applies to all lifting operations using : 

• On-Track Plant (OTP)

• On-track Machines (OTMs)

• Road mobile cranes

• Lorry mounted knuckle boom cranes

• Mobile Elevating Work Platforms (MEWPs)

• Manually powered lifting equipment

The requirements of this standard do not apply to rail mounted recovery cranes.

This specification supports The Lifting Operations and Lifting Equipment Regulations (LOLER) and Rail Industry Standards.

Purpose

This standard details the requirements for planning all lifting operations, including tandem lifting, undertaken on Network Rail managed infrastructure.


Edition : 2
File Size : 1 file , 750 KB
Number of Pages : 20
Published : 03/03/2012

History


Related products

NR NR/CIV/SD/16M/133 ISSUE D
Published Date: 06/01/2019
Non-Station Footbridges up to 16m (100 series): Main Span - Canopy Option Details
$5.7
NR NR/SMS/PART/C ISSUE 22
Published Date: 12/02/2023
Signal Maintenance Specifications (SMS): PART C
$130.2
NR RT/E/C/11110 ISSUE 1
Published Date: 08/01/2000
OUTLINE PROJECT SPECIFICATIONS (OPS) FOR SIGNALLING SCHEMES (aka NR/GN/SIG/11110)
$13.2
NR T60196 ISSUE 2
Published Date: 10/07/2005
Lineside & on Track Equipment Typical Circuits Point Machine T72 Point Machine & J.B Type 2, L.H.S.N.C. (Position 1 Normal) ACC: Electronic Interface (DEV/ CDEV) or (DEP/ CDEP) Detection Circuit
$5.7

Best-Selling Products