NR NR/L2/RMVP/0200/P014 ISSUE 2 PDF

NR NR/L2/RMVP/0200/P014 ISSUE 2 PDF

Name:
NR NR/L2/RMVP/0200/P014 ISSUE 2 PDF

Published Date:
03/03/2012

Status:
[ Revised ]

Description:

Plant Operations Manual: Use of Trailers and Attachments with OTP (including Brake Testing)

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$7.5
Need Help?
PDF ONLY

This Standard applies to;

a) all rail trailers and rail mounted attachments with more than two rail wheels towed or propelled by OTP

b) items of OTP that are towed as trailers

c) failed items of OTP being recovered when on Network Rail managed infrastructure.

Trailers with braking equipment to UIC specifications do not fall within the scope of these rules.

Purpose

This Standard details the requirements and actions to be taken when using trailers and attachments on Network Rail managed infrastructure.


Edition : 2
File Size : 1 file , 84 KB
Number of Pages : 9
Published : 03/03/2012

History


Related products

NR NR/L3/ELP/27240/NR/DIST C25T ISSUE 2
Published Date: 03/01/2017
Routine Maintenance of 750v d.c. Disconnect Switches
$5.7
NR X22180 ISSUE 2
Published Date: 08/07/2004
ABCL Typical Circuits Double Line Bi-Directional Monitor Circuits (1)
$5.7
NR BRS-SM 52482
Published Date: 09/07/1995
HW & 63 Electric Point Machines Parts Schedule For Switch Diamonds L.H. On Timber 113A Stock. UIC-54B Switch Rail
$5.7

Best-Selling Products