NR NR/L2/RMVP/0200/P101 ISSUE 4 PDF

NR NR/L2/RMVP/0200/P101 ISSUE 4 PDF

Name:
NR NR/L2/RMVP/0200/P101 ISSUE 4 PDF

Published Date:
06/04/2022

Status:
[ Active ]

Description:

Infrastructure Plant Manual: Monitoring Plant Activities

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$7.5
Need Help?
PDF ONLY

This module defines the requirements for:

a) monitoring the performance (safety, reliability and availability) of plant assets;

b) monitoring of personnel directly involved in the supervision or operation of plant assets, for example, machine operator, crane controller;

c) monitoring plant operations; and

d) assurance and audit processes for plant.

This module applies to any organisations involved with any of the following:

a) procurement or supply of plant;

b) management and supervision of plant operations;

c) carrying out plant operations; and

d) maintenance of plant used on Network Rail managed infrastructure and Network Rail projects.

Purpose

The implementation of this module contributes to mitigating the following risks:

a) incorrect lifting operations (LOLER);

b) lack of RIDDOR or close call reporting; and

c) lack of continuous improvement e.g. mitigating factors from incidents not being introduced to machine/operating procedures.


Edition : 4
File Size : 1 file , 260 KB
Number of Pages : 9
Published : 06/04/2022

History

NR NR/L2/RMVP/0200/P101 ISSUE 4
Published Date: 06/04/2022
Infrastructure Plant Manual: Monitoring Plant Activities
$7.5
NR NR/L2/RMVP/0200/P101 ISSUE 3
Published Date: 12/01/2018
Infrastructure Plant Manual: Monitoring Plant Activities
$7.5

Related products

NR BRS-SM 423
Published Date: 04/27/1966
FP Lock Bar Fittings Rail Clip Type 'B' Complete for FB Cut Away Stock Rail
$5.7
NR NR/SIG/10665/MOD 021 ISSUE 1
Published Date: 03/02/2013
Reliability Centred Maintenance of Signalling Equipment (ROSE) - Vaughan Harmon Small Train Describer Type 4M (NR/ROSE/TD-A1/1)
$7.5
NR BRS-SM 2248
Published Date: 03/06/1990
Pins for HW Point Machines
$5.7
NR NR/L2/TRK/6100/MOD02 ISSUE 2
Published Date: 06/03/2023
The Installation and Maintenance of Stretcher Bars: Roles and Responsibilities for Installation, Inspection and Maintenance of Stretcher Bars
$7.5

Best-Selling Products

ASHRAE/AMCA 51-1999 Addendum a-2001
Published Date: 2001
Addendum a-2001 to Standard 51-1999 -- Laboratory Methods of Testing Fans for Aerodynamic Performance Rating (AMCA Standard 210-99) (ANSI approved)
Free Download
ASHRAE/AMCA 51-1999
Published Date: 1999
Standard 51-1999 -- Laboratory Methods of Testing Fans for Aerodynamic Performance Rating (AMCA Standard 210-99) (ANSI approved)
$21.6
ASHRAE/AMCA 51-2007
Published Date: 2008
Standard 51-2007 -- Laboratory Methods of Testing Fans for Aerodynamic Performance Rating (ANSI/ASHRAE Approved) (ANSI/AMCA Standard 210-07)
$32.7