NR NR/L2/RMVP/0200/P102 ISSUE 4 PDF

NR NR/L2/RMVP/0200/P102 ISSUE 4 PDF

Name:
NR NR/L2/RMVP/0200/P102 ISSUE 4 PDF

Published Date:
06/04/2022

Status:
[ Active ]

Description:

Infrastructure Plant Manual: Plant Occupational Health

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$13.2
Need Help?
PDF ONLY

This module applies to Network Rail Network Operations, Capital Delivery and Route Services only

It is expected that, Network Rail’s Suppliers will have their own systems in place for health surveillance (Regulation 7), and the provision of information, instruction and training (Regulation 8) for work under their control.

Purpose

The Health and Safety at Work etc Act 1974 is the primary piece of legislation covering occupational health and safety in Great Britain and is referred to as HASAWA.

The implementation of this module contributes to the compliance with HASAWA legislative requirements (LOLER, PUWER, HAVs and COSHH) and to mitigate the occupational health risks:

a) exposure of staff to hand-arm vibration (HAV);

b) whole body vibration

c) working at height;

d) exposure to airborne particles and associated hazards;

e) staff fatigue;

f) hearing loss;

g) exposure to noise (hearing loss);

h) injury due to manual handling (e.g. lifting);

i) exposure to substances hazardous to health (COSHH) substances.


Edition : 4
File Size : 1 file , 360 KB
Number of Pages : 14
Published : 06/04/2022

History

NR NR/L2/RMVP/0200/P102 ISSUE 4
Published Date: 06/04/2022
Infrastructure Plant Manual: Plant Occupational Health
$13.2
NR NR/L2/RMVP/0200/P102 ISSUE 3
Published Date: 12/01/2018
Infrastructure Plant Manual: Plant Occupational Health
$13.2

Related products

NR RT/E/WI/27112 ISSUE 1
Published Date: 12/04/2004
Instruction for the Urgent Communication of Information of a Serious Safety or Technical Nature Concerning Electrification Fixed Equipment Except the Sc, Se & Sw Divisions of Network Southeast (aka NR/WI/ELP/27112)
$13.2
NR BR 933 ISSUE A4
Published Date: 05/01/1977
Specification for Miniature Tractive Armature AC Immune DC Slow Pick-Up Neutral Line Relay, Plug-In Type for Railway Signalling Purposes
$18.6
NR NR/SMS/PART/Z ISSUE 16
Published Date: 12/02/2023
Signal Maintenance Specifications (SMS): PART Z
$24.3
NR RT/CE/C/039 ISSUE 2
Published Date: 12/01/2003
Formation treatments
$18.6

Best-Selling Products

ICML 55.1
Published Date: 2019
ICML 55.1 Standard - Part 1: Asset Management. Requirements for the Optimized Lubrication of Mechanical Physical Assets