Name:
NR NR/L2/RMVP/0200/P507 ISSUE 2 PDF
Published Date:
06/03/2017
Status:
[ Withdrawn ]
Publisher:
Network Rail
This module defines:
a) the general principles of operation when using on-track plant (OTP), including the requirement to move on and off the track at approved access points;
b) the procedure for planning the use of OTP and how to protect against hazards;
c) when an OTP may be moved without a machine controller (MC); and
d) the requirements for the use and maintenance of load-lifting points.
This document applies to organisations involved with any of the following:
a) planning or supply of OTP; and
b) carrying out or controlling operations that involve OTP on Network Rail managed infrastructure and Network Rail projects.
See the index of NR/L2/RMVP/0200 for information on which:
a) specific roles this module applies to; and
b) modules that also apply to those roles.
Purpose
The implementation of this module contributes to mitigating the following risks:
a) compliance with legislation (LOLER, PUWER, HASAW);
b) damage to assets, e.g. RRV or its load hitting a passing train during ALO operation;
c) runaway/failure to stop on demand, e.g. OTP running away on a gradient;
d) collision, e.g. collision between a RRV and an OTM;
e) overturning, e.g. RRV overturning during lifting operations;
f) staff injuries, e.g. operator.
| Edition : | 2 |
| File Size : | 1 file , 750 KB |
| Number of Pages : | 20 |
| Published : | 06/03/2017 |