NR NR/L2/RMVP/0200/P515 ISSUE 4 PDF

NR NR/L2/RMVP/0200/P515 ISSUE 4 PDF

Name:
NR NR/L2/RMVP/0200/P515 ISSUE 4 PDF

Published Date:
06/04/2022

Status:
[ Active ]

Description:

Infrastructure Plant Manual: Portable and Transportable Plant

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Czech version):
200 business days

SKU:
nr-nr-l2-rmvp-0200-p515-issue-4_2762084

Choose Document Language:
7.50 €
Need Help?
PDF ONLY

This module describes the requirements for design, maintenance and management of Portable and Transportable plant, such as: 

• Powered Plant 

• Non- Powered Plant 

• Manually Propelled Plant (Powered) 

• Manually Propelled Plant (Non- Powered); and 

 This document applies to organisations that are involved with any of the following:

a) planning or supply of any of the categories above;

b) carrying out or controlling operations using any of the categories above; and

c) maintenance of any of the categories above.

Purpose

The implementation of this module contributes to mitigating the following risks: 

a) compliance with legislation (LOLER, PUWER, HASAW); 

b) damage to assets; 

c) staff injuries, e.g. staff being trapped between plant and infrastructure.


Edition : 4
File Size : 1 file , 190 KB
Number of Pages : 7
Published : 06/04/2022

History

NR NR/L2/RMVP/0200/P515 ISSUE 4
Published Date: 06/04/2022
Infrastructure Plant Manual: Portable and Transportable Plant
7.50 €
NR NR/L2/RMVP/0200/P515 ISSUE 3
Published Date: 12/01/2018
Infrastructure Plant Manual: Portable and Transportable Plant
7.50 €

Related products

NR T25315 ISSUE 1
Published Date: 03/06/2010
Lineside & On Track Typical Circuits Points Point Machine - SSI. SSI Module Output & Input Circuits
5.70 €
NR NR/L3/ELP/27250 ISSUE 9
Published Date: 09/07/2024
Conductor Rail Equipment - Design and Maintenance Working Instructions
74.40 €
NR RT/E/C/11724 ISSUE 1
Published Date: 06/01/2002
Signalling Works Test Specifications and Historical Test Value Data (aka NR/GN/SIG/11724)
24.30 €
NR BRS-SM 5517 ISSUE B
Published Date: 07/20/1986
Rail Clamp Point Lock Schedule of Components Lock & Detector Arm Assy; Type SD 1 for 1 in 7 1/2 to 1 in 17 Switch Diamonds
5.70 €

Best-Selling Products

FM Approvals 1011/1012/1013:2020
Published Date: 12/01/2020
Examination Standard for Deluge and Preaction Sprinkler Systems
15.00 €
FM Approvals 1011/1012/1013
Published Date: 09/01/2009
Deluge and Preaction Sprinkler Systems
15.00 €
FM Approvals 1020:2020
Published Date: 12/01/2020
Examination Standard for Automatic Water Control Valves
15.00 €
FM Approvals 1020
Published Date: 04/01/2007
Automatic Water Control Valves
15.00 €
FM Approvals 1021:2020
Published Date: 12/01/2020
Dry Pipe Valves
15.00 €
FM Approvals 1021
Published Date: 11/01/1973
Dry Pipe Valves
15.00 €