NR NR/L2/RSE/02009/02 ISSUE 2 PDF

NR NR/L2/RSE/02009/02 ISSUE 2 PDF

Name:
NR NR/L2/RSE/02009/02 ISSUE 2 PDF

Published Date:
03/06/2021

Status:
[ Active ]

Description:

Engineering Management for Projects: The Management and Review of Engineering Deliverables

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$13.2
Need Help?
PDF ONLY

This module covers the processes for:

a) determining the level of review for engineering deliverables;

b) the requirements for a basic and detailed review of engineering deliverables; and

c) the engineering management requirements for those involved in the acceptance of engineering deliverables.

The process applies to the project staff involved in the review of engineering deliverables throughout the project lifecycle.

Purpose

The purpose of this module is to define the process for the submission and acceptance of engineering deliverables. This process enables Network Rail to manage the risks associated with the quality of submitted engineering deliverables.

This module provides auditable, controlled and consistent processes for the management and technical acceptance review of engineering deliverables.


Edition : 2
File Size : 1 file , 200 KB
Number of Pages : 11
Published : 03/06/2021

History

NR NR/L2/RSE/02009/02 ISSUE 2
Published Date: 03/06/2021
Engineering Management for Projects: The Management and Review of Engineering Deliverables
$13.2
NR NR/L2/INI/02009/02 ISSUE 1
Published Date: 09/05/2015
Engineering Management for Projects - Authority to Work (AtW) Competence Requirements
$13.2

Related products

NR NR/L3/SIG/10064/GI/A016 ISSUE 3
Published Date: 09/04/2021
General Instructions to Staff Working on S&T Equipment: Definition of Safety-Critical Work
$5.7
NR NR/L2/SIG/30014/D120/TS7-11 ISSUE 4
Published Date: 09/03/2022
Signalling Works Testing Handbook: Semaphore Signal Signalling Works Test Specification
$7.5
NR BRS-SM 502 ISSUE F
Published Date: 07/20/1986
Rail Clamp Point Lock Lock & Detector Arm Assembly Type 'A'
$5.7
NR T60179 ISSUE 2
Published Date: 10/07/2005
Lineside & on Track Equipment Typical Circuits Point Machine-T72 Point Machine & J.B Type 1, R.H.S.N.C (Position 2 Normal) Acc: Electronic Interface (DEV/CDEV) or (DEP/ CDEP) Detection Circuit With 2 Supplementary Detectors
$5.7

Best-Selling Products

NS-EN ISO/IEC 10373:1995
Published Date: 04/04/1995
Identification cards — Test methods (ISO/IEC 10373:1993)
NS-EN ISO/IEC 11159:1996
Published Date: 09/04/1996
Information technology — Office equipment — Minimum information to be included in specification sheets — Copying machines (ISO/IEC 11159:1992)
NS-EN ISO/IEC 11159:1998
Published Date: 03/25/1998
Information technology — Office equipment — Minimum information to be included in specification sheets — Copying machines (ISO/IEC 11159:1996)
NS-EN ISO/IEC 11172-1:1995
Published Date: 05/11/1995
Information technology — Coding of moving pictures and associated audio for digital storage media at up to about 1,5 Mbit/s — Part 1: Systems — (ISO/IEC 11172-1:1993)
NS-EN ISO/IEC 11172-2:1995
Published Date: 05/11/1995
Information technology — Coding of moving pictures and associated audio for digital storage media at up to about 1,5 Mbit/s — Part 2: Video (ISO/IEC 11172-2:1993)
NS-EN ISO/IEC 11172-3:1995
Published Date: 05/11/1995
Information technology — Coding of moving pictures and associated audio for digital storage media at up to about 1,5 Mbit/s — Part 3: Audio (ISO/IEC 11172-3:1995)