NR NR/L2/RSE/02009/02 ISSUE 2 PDF

NR NR/L2/RSE/02009/02 ISSUE 2 PDF

Name:
NR NR/L2/RSE/02009/02 ISSUE 2 PDF

Published Date:
03/06/2021

Status:
[ Active ]

Description:

Engineering Management for Projects: The Management and Review of Engineering Deliverables

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Czech version):
200 business days

SKU:
nr-nr-l2-rse-02009-02-issue-2_2763782

Choose Document Language:
13.20 €
Need Help?
PDF ONLY

This module covers the processes for:

a) determining the level of review for engineering deliverables;

b) the requirements for a basic and detailed review of engineering deliverables; and

c) the engineering management requirements for those involved in the acceptance of engineering deliverables.

The process applies to the project staff involved in the review of engineering deliverables throughout the project lifecycle.

Purpose

The purpose of this module is to define the process for the submission and acceptance of engineering deliverables. This process enables Network Rail to manage the risks associated with the quality of submitted engineering deliverables.

This module provides auditable, controlled and consistent processes for the management and technical acceptance review of engineering deliverables.


Edition : 2
File Size : 1 file , 200 KB
Number of Pages : 11
Published : 03/06/2021

History

NR NR/L2/RSE/02009/02 ISSUE 2
Published Date: 03/06/2021
Engineering Management for Projects: The Management and Review of Engineering Deliverables
13.20 €
NR NR/L2/INI/02009/02 ISSUE 1
Published Date: 09/05/2015
Engineering Management for Projects - Authority to Work (AtW) Competence Requirements
13.20 €

Related products

NR NR/L3/SIG/10064/GI/A016 ISSUE 3
Published Date: 09/04/2021
General Instructions to Staff Working on S&T Equipment: Definition of Safety-Critical Work
5.70 €
NR NR/L2/SIG/30014/D120/TS7-11 ISSUE 4
Published Date: 09/03/2022
Signalling Works Testing Handbook: Semaphore Signal Signalling Works Test Specification
7.50 €
NR BRS-SM 502 ISSUE F
Published Date: 07/20/1986
Rail Clamp Point Lock Lock & Detector Arm Assembly Type 'A'
5.70 €
NR T60179 ISSUE 2
Published Date: 10/07/2005
Lineside & on Track Equipment Typical Circuits Point Machine-T72 Point Machine & J.B Type 1, R.H.S.N.C (Position 2 Normal) Acc: Electronic Interface (DEV/CDEV) or (DEP/ CDEP) Detection Circuit With 2 Supplementary Detectors
5.70 €

Best-Selling Products

ICAO 10000
Published Date: 2014
Manual on Flight Data Analysis Programmes (FDAP)
ICAO 10000
Published Date: 01/01/2014
Manual on Flight Data Analysis Programmes (FDAP)
ICAO 10000
Published Date: 01/01/2021
Manual on Flight Data Analysis Programmes (FDAP)
ICAO 10000
Published Date: 01/01/2021
Руководство по программам анализа полетных данных (ПАПД)
ICAO 10000
Published Date: 01/01/2021
Manuel sur les programmes d’analyse des données de vol (FDAP)
ICAO 10000
Published Date: 01/01/2014
Manual on Flight Data Analysis Programmes (FDAP)