NR NR/L2/RSE/070 ISSUE 2 PDF

NR NR/L2/RSE/070 ISSUE 2 PDF

Name:
NR NR/L2/RSE/070 ISSUE 2 PDF

Published Date:
12/03/2011

Status:
[ Revised ]

Description:

Engineering Verification

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$13.2
Need Help?
PDF ONLY

The Engineering Verification process applies to all infrastructure assets which Network Rail manages, irrespective of which team within Network Rail is responsible for them.

It applies to assets at all stages of their life, so includes those under construction, renewal and recently completed.

Purpose

Engineering Verification is a part of Network Rail's assurance process for confirming that infrastructure assets are fit for purpose.

Its aim is to check how well our control processes work by physically inspecting infrastructure assets, at all stages of their life, to check that they:

a) comply with standards;

b) are free from defects or problems which may affect the safety of the line, even if the assets comply with standards;

c) are in a condition consistent with asset records;

d) are in the condition that would be expected from the inspections carried out and the work recorded as being needed in work databases.

It is additional to other assurance processes such as audit or regular process checks, complementing them by:

a) being focussed on the physical state of the asset, such as the reliability and integrity of the asset, as well as whether it complies with standards;

b) being carried out independently of the team responsible for constructing or maintaining the asset;

c) looking at the wider safety picture;

d) assessing whether standards are appropriate.

Although mainly focussed on the safety of the assets it also considers wider business performance issues. It also provides opportunities for:

a) transferring lessons across Network Rail, including good practice;

b) examining the local root cause of any issues found with the asset;

c) identifying developing trends;

d) coaching and mentoring people on the management of assets, checking for their training needs and any skills gaps;

e) identifying public interface issues e.g. trespass and vandalism, vehicle incursion, level crossing misuse.


Edition : 2
File Size : 1 file , 270 KB
Number of Pages : 14
Published : 12/03/2011

History

NR NR/L2/RSE/070 ISSUE 3
Published Date: 03/05/2022
Engineering Verification
$13.2
NR NR/L2/RSE/070 ISSUE 2
Published Date: 12/03/2011
Engineering Verification
$13.2

Related products

NR NR/CIV/SD/2228-1 ISSUE C
Published Date: 09/02/2017
Conarch Overbridge: Reinforcement Details Capping Slab for 9.4m Span Right Skew 45 Degrees Curved Deck
$5.7
NR NR/L2/ELP/27009/MOD C27 ISSUE 1
Published Date: 12/03/2011
FAILURE OF CROSS SPAN WIRE TO TUBE CLAMPS WHEN DISTURBED
$5.7
NR BRS-SM 3203 ISSUE A
Published Date: 06/30/2015
RCPL Operated Point Layout with Tubular Stretcher Bars - Full Depth BV Switches CEN56/CEN56 (113A FB) - Mechanical Supplementary Drive Mounted External to 4 Foot
$5.7
NR NR/L2/SIG/30014/G130/A&R05 ISSUE 1
Published Date: 09/03/2011
Temporary Alteration to Ground Frame Proving
$5.7

Best-Selling Products

CII BMM2001-10
Published Date:
Impacts of Design/Information Technology on Building and Industrial Projects
$36
CII BMM2002-10
Published Date: 11/01/2002
Measuring the Impacts of the Delivery System on Project Performance -- Design-Build and Design-Bid-Build
$36
CII BMM2002-3
Published Date: 02/01/2002
Benchmarking and Metrics Summary Report for 2001
$36
CII BMM2004-10
Published Date: 10/01/2004
Best Practices for Project Security
$36
CII BMM2006-10
Published Date: 07/01/2006
Lessons Learned in the Implementation of Best Practices for Project Security
$36
CII BMM2006-11
Published Date: 11/01/2006
Impacts of Automation and Integration Technologies on Project and Company Performance
$36