NR NR/L2/RSE/100/01 ISSUE 2 PDF

NR NR/L2/RSE/100/01 ISSUE 2 PDF

Name:
NR NR/L2/RSE/100/01 ISSUE 2 PDF

Published Date:
12/05/2015

Status:
[ Revised ]

Description:

Network Rail Assurance Panel Processes: Network Rail Assurance Panel

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$13.2
Need Help?
PDF ONLY

This module specifies NRAP’s accountabilities and the processes it follows in order to fulfil them.

It applies to anyone making an application:

a) to introduce new or changed vehicles on Network Rail Infrastructure, or change where they operate (as defined by the authorised routes); or

b) that could affect the compatibility between vehicles and Network Rail infrastructure; or

c) that is a change to Network Rail infrastructure; or the way it is operated

NOTE The scope of NRAP does not normally include maintenance of equipment, or equipment replaced due to failure. This applies if approved equipment in pre-existing applications is used, that no designs are produced and the configuration of NR infrastructure is unchanged.

d) to introduce new or changed products as part of Network Rail Infrastructure. This applies even if the application will not be controlled or carried out by Network Rail.

Purpose

Network Rail Assurance Panel (NRAP) governs a number of Network Rail processes on behalf of Network Rail’s Executive through the STE Business Performance Management Group (STE BPMG).

These processes help Network Rail comply with its statutory responsibilities and Health and Safety Management System when a change is introduced that could change the risk profile of Network Rail Infrastructure.

This module sets out how NRAP carries out these responsibilities and delegates authority to bodies and individuals within Network Rail.

The module helps applicants to identify the correct process for their proposal. NRAP governs a number of processes that provide appropriate review prior to projects, products and vehicles being brought into service.

They are:

NR/L2/RSE/100/02 Application of the Common Safety Method for Risk Evaluation and Assesment

NR/L2/RSE/100/03 The application of the interoperability regulations for infrastructure projects

NR/L2/RSE/100/04 Introduction of new or modified vehicles

NR/L2/RSE/100/05 Product introduction and change to Network rail operational infrastructure

NR/L2/RSE/100/06 How to decide what needs product acceptance via

NR/L2/RSE/100/05 NR/L2/RSE/100/07 System Review Panels


Edition : 2
File Size : 3 files , 2.3 MB
Number of Pages : 13
Published : 12/05/2015

History

NR NR/L2/RSE/100/01 ISSUE 3
Published Date: 06/01/2024
Network Rail Assurance Panel Processes: Network Rail Assurance Panel
$13.2
NR NR/L2/RSE/100/01 ISSUE 2
Published Date: 12/05/2015
Network Rail Assurance Panel Processes: Network Rail Assurance Panel
$13.2

Related products

NR NR/L3/OCS/044/MS-35 ISSUE 2
Published Date: 06/04/2011
Managed Station Manual: Station Equipment Monitoring
$5.7
NR SAO-IEC-HD-50 ISSUE 5
Published Date: 10/01/2003
Integrated Electronic Control System Data Preparation Manual IDPM 1002 IECC System Monitor Reference
$24.3
NR BRS-SM 214 ISSUE B
Published Date: 10/31/1974
Escapement Crank Complete
$5.7
NR NR/L2/CIV/086 ISSUE 12
Published Date: 06/01/2024
Management of Earthworks
$18.6

Best-Selling Products

IDEMA H7-94
Published Date: 01/01/1994
Sign Convention Standard
IDEMA H8-94
Published Date: 01/01/1994
Glossary of Suspension Terms Purpose
IDEMA R1-98
Published Date: 01/01/1998
HDD Handling Environment Assessment & Simulation Test Procedure using Test Tailoring
$13.8
IDEMA T11-91
Published Date: 01/01/1991
Window Margin