NR NR/L2/RVE/0116 ISSUE 1 PDF

NR NR/L2/RVE/0116 ISSUE 1 PDF

Name:
NR NR/L2/RVE/0116 ISSUE 1 PDF

Published Date:
06/01/2008

Status:
[ Withdrawn ]

Description:

Acceptance of Maintenance Plans

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$13.2
Need Help?
W/D * PDF ONLY

The scope of this procedure covers the acceptance of new or amended maintenance plans for wagons operating, or intending to operate, under the PWRA Agreements.

Purpose

This procedure defines the method by which Network Rail's PWRA meets the requirement to accept new or amended maintenance plans, as required by the PWRA Agreements, is controlled and conformed to by both Network Rail and the signatories to the Agreements.


Edition : 1
File Size : 1 file , 390 KB
Number of Pages : 11
Published : 06/01/2008

History


Related products

NR BRS-SM 2240/S2
Published Date: 10/19/1987
Rail Clamp Point Lock MK 2 Switch Diamond Layout (110 & 113 FB Rail) Switch Rail Bracket Assembly for Crossing Angles 1:7.5 to 1:15
$5.7
NR BRS-SM 691/1
Published Date: 10/01/1981
Track Circuit Cable Clips Clamp Plate for Fixing to Concrete Sleepers
$5.7
NR TEF 3207 ISSUE 4
Published Date: 09/01/2021
Record of Site Details for Critical Rail Temperature Calculation
$5.7
NR NR/L2/SIG/30014/B110 ISSUE 4
Published Date: 09/07/2024
Signalling Works Testing IRSE Licensing Requirements
$13.2

Best-Selling Products