Description:

Control of Movements in Depots, Yards and Associated Depot Sidings (Methods of Work)

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$18.6
Need Help?
PDF ONLY

This business process applies to:

  a) all rail vehicle maintenance Depots and yards including sidings associated with the Depot in which Network Rail Supply Chain Operations (SCO) rail fleet is maintained and stabled;

  b) local distribution centres.

It outlines the principles and requirements for the development and updating of Methods of Work (MoW) for those Depots, yards and associated Depot sidings.

Where a MoW has been supplied or compiled by a third party or Train Operating Companies (TOC)/Freight Operating Companies (FOC), that MoW is subject to review by Network Rail, SCO – Regional Depot Responsible Person to verify compliance with this process.

Purpose 

This business process sets out the minimum requirements for the Methods of Work (MoW) that apply to all rail vehicle maintenance Depots and yards including sidings associated with the Depot owned by Network Rail and operated by Supply Chain Operations, to confirm safe systems of work are in operation. 

The application of the requirements and procedures contained within this business process mitigate the following high-level risks: 

a) operational safety risks posed to Network Rail and third-party staff by the movement of rail vehicles; 

b) non-compliance with legislation and regulatory requirements. 


Edition : 1
File Size : 1 file , 440 KB
Number of Pages : 26
Published : 12/03/2022

History


Related products

NR BRS-SM 2371/1&7 ISSUE B
Published Date: 02/27/1996
Mechanical Supplementary Drive Mounted IN 4' for UIC-54B CVS Layout Clamp Lock or Point M/C Operated
$5.7
NR BRS-SM 5450
Published Date:
4" Centres Ground Frame Without Interlocking Complete with Framework & Cover Schedule of Components
$5.7
NR T28010 ISSUE 1
Published Date: 09/11/1997
Lineside & on Track Equipment Typical Circuits Signals & Indicators Automatic Signal Replacement and Proving Alternatives
$5.7
NR NR/L3/ELP/27240/NR/DIST C34C ISSUE 1
Published Date: 12/05/2020
Routine Maintenance of the AC/DC Interface DC Contactors at Ludgate Cellars Substation
$7.5