NR NR/L2/SIG/10028 ISSUE 7 PDF

NR NR/L2/SIG/10028 ISSUE 7 PDF

Name:
NR NR/L2/SIG/10028 ISSUE 7 PDF

Published Date:
12/05/2015

Status:
[ Active ]

Description:

Supervisory Inspection of Signalling Assets

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$24.3
Need Help?
PDF ONLY

The business process is limited to the planning, implementation and review of signalling supervisory asset inspections.

It applies to inspection of signalling assets under the control of the Signal and Telecoms Maintenance Engineer (S&TME).

This process does not cover SICA inspections or Engineering Verifications which are detailed as part of other business processes.

Purpose

The business process for inspection of signalling assets:

•provides assurance that assets are being maintained to the correct standard

•verifies the asset condition is as expected for the current maintenance regime and the age of installation

•provides verification of ellipse data against the asset information specification for a sample the assets inspected.

Failure to follow this process could result in a reduction in safety and reliability.


Edition : 7
File Size : 1 file , 540 KB
Number of Pages : 51
Published : 12/05/2015

History


Related products

NR NR/CIV/SD/1237 ISSUE C
Published Date: 12/03/2016
Z-Type Underbridges: Transverse Rib & Trimmer Girder: 25 to 50 Degrees Skew Steel Floor Sheet 1 of 2
$5.7
NR NB 066 ISSUE 1
Published Date: 12/01/2006
The Interdisciplinary Management of Touch Potentials
$5.7
NR NR/L3/ELP/27240/NR/DIST C26H ISSUE 2
Published Date: 03/01/2017
Routine Testing of Track Circuit Protection Unit
$5.7
NR NR/CIV/SD/541 ISSUE B
Published Date: 09/02/2017
Tunnel Lining Maintenance Sprayed Concrete Patch Repairs to Crown/Haunch
$5.7

Best-Selling Products